M-5 motorway (Pakistan)
The M-5 motorway, also known as Multan–Sukkur Motorway, is a north–south motorway in Pakistan, which connects Multan and Sukkur. The M-5 is a 392 km long, high-speed, controlled-access, six-lane motorway that forms part of the China-Pakistan Economic Corridor. It is currently the longest motorway in Pakistan. It is one of the longest parts of the Lahore-Karachi Motorway.
History
The approval for the Multan-Sukkur Motorway was granted in July 2014, with an estimated cost of Rs. 200 billion. In May 2016, the Pakistani government awarded the contract to build this section to China State Construction Engineering, with the completion date being August 2019. Former Prime Minister Nawaz Sharif performed the groundbreaking on 6 May 2016, while the actual ground work started in August 2016.The M-5 motorway project forms a cornerstone of the much-larger China–Pakistan Economic Corridor. Construction covered 21 Chinese residential camps and 23 Pakistani workers camps with hundreds of working sites, directly providing jobs to nearly 30,000 Pakistanis at peak time. The motorway was inaugurated on 5 November 2019 in the 9th Joint Cooperation Committee meeting in Islamabad.