Montrose oil field


The Montrose oil field is a significant crude oil producing field in the UK sector of the central North Sea, 210 km east of Aberdeen. Production of oil started in 1976 and a major upgrade in 2016 extended the field life to beyond 2030.

The field

The Montrose oil field is located in Blocks 22/17 and 22/18 of the UK North Sea. It is named after the Scottish east coast town of Montrose. The field was discovered in November 1971 and is a Palaeocene sandstone at a depth of 8,000 feet. The reservoir has the following characteristics:
ParameterValue
API gravity38.5-40°
Gas Oil Ratio600-700 scf/bbl
Porosity22.8%
Permeability39.3 md
Pressure3,750 psi at 8,150 TVDSS
Sulfur0.23%
Recoverable reserves86.4 million barrels
12.8 million tonnes

Owners and operators

The field was originally licensed to a joint venture comprising Amoco UK Petroleum Limited, Enterprise Oil plc, Amerada Hess Exploration Ltd, and Texas Eastern Ltd. The field was originally operated by Amoco Exploration Company. Ownership of the Montrose field passed from Amoco to BP to Paladin Resources, until Talisman Energy took over in 2012 and most recently Repsol bought the assets in joint ownership with Sinopec. In late 2023
Sinopec sold their share to Repsol who became sole operator. In 2025 Repsol merged their UK interests with that of Neo Energy to create the operator Neo Next.

Development

The field was developed by a single integrated production platform Montrose Alpha. Oil was initially exported through a pair of CALM buoys located 1.7 km from the platform. In 1982 a 48 km 14-inch oil pipeline from Montrose to Forties Charlie was commissioned which provided an oil export route.
InstallationMontrose AMontrose bridge linked platformCALM buoys
Coordinates57°27'02"N 01°23'16"E
Water depth, metres888891
FabricationUIE Cherbourg and St. WandrilleHeerema Fabrication, Zwijndrecht NetherlandsEarl Wright Newcastle
Topside weight, tonnes14,00010,500
FunctionDrilling, production, accommodationProcess and utilitiesOffloading oil
Accommodation96
TypeSteel jacketSteel jacketCatenary anchor leg
Legs84
Piles326
Well slots24
Throughput oil, bpd60,00040,00060,000
Oil storage capacity, barrelsNilNil
Installed197520161975
Production startJune 197620161976
Oil production toCALM buoys
Forties Charlie 48 km 14-inch
Montrose A Tankers 72,000 dwt
Gas production toFlareMontrose A

Production

The original processing plant on Montrose A had a nominal capacity of 60,000 barrels of oil per day. Water injection was 55,000 barrels per day. There were 16 production wellheads, and 4 water injection wells. The production of oil was:There were two Catenary Anchor Leg Mooring buoys in 91 metres of water. They were used from 1976 to 1984 to load tankers. They were decommissioned in 1984 when the 48 km 14-inch oil export line from Montrose to Forties Charlie was commissioned.
Montrose was a 'stranded asset' with no nearby export route for gas, the gas was therefore flared. A horizontal 455 feet long flare bridge was installed between the platform and the flare. The bridge was supported by a tripod jacket.

Redevelopment

In 1990, Amoco modified the Montrose A processing equipment to receive oil from the then new Arbroath field integrated drilling and production platform. The discovery of the Wood oil field entailed the installation of the Wood and Gas Export processing and compression module on Montrose A and a new 6-inch pipeline delivered gas into the CATS offshore pipeline on Arbroath.
Three new fields – Godwin, Cayley and Shaw – were discovered in the Montrose area. Additional process facilities were required to develop these fields. Details of the field were as follows:
NameBlockDiscoveredLocationWater depthDevelopedStart-up
Cayley22/17200710 km west of Montrose91 m2 subsea productionJune 2017
Shaw22/22200917 km north of Montrose3 subsea production, 2 injectionMay 2017
Wood22/18199610 km south east of Montrose92 m1 subsea wellDecember 2007

A new platform was installed adjacent to Montrose A in 2016. This was known as the bridge-linked platform and provided additional process and plant support facilities. Production increased to 40,000 boe per day.