Midhope Reservoir


Midhope Reservoir is an upland body of fresh water that impounds moorland streams and overflows via Hagg Brook into the Little Don River in South Yorkshire, England. The reservoir was built by the Barnsley Corporation Water Works, then becoming part of Yorkshire Water in 1973.

History

The reservoir covers an area of with an average depth of and typically stores of water. It has a catchment area of, lies at a height of above sea level, and when is at water capacity level, covers. The catchment area consists largely of forested land overlain on millstone grit and coal measures. When the water levels are low, the east bank of the reservoir reveals a strata of rock including sandstone, grey shale, blue shale, clay with iron nodules and black shale.
Plans were lodged with Westminster for Parliamentary approval in late 1894 with the scheme estimated to cost £170,000 and the reservoir was entitled as Hagg Brook, the stream that it was to be built across. This was met with opposition from a number of landowners, and the corporations of Doncaster, Rotherham and Sheffield. The bill was held up in the House of Lords, and then a General Election in 1895 delayed its passing through Parliament. The bill was approved in 1896 as . An agreement was reached with the Sheffield Corporation regarding the building of their Langsett Reservoir; the Barnsley Corporation would allow a flow of water to enter the River Don system in order to compensate any loss of water during the building works if Midhope Reservoir was completed first. In October 1896, boreholes were drilled in the area of the dam.
Work on the site began in 1897 after an official sod-cutting ceremony. The valves of the reservoir were opened by the Lord Mayor of Barnsley on 25 June 1903, acting as a grand opening ceremony, however, work on the site continued, and it wasn't until March 1905 that the final clearance sale of locomotives, static engines, steam cranes and other items were listed in a final sale. The final cost of the works at 1905 was £300,000.
The embankment across Hagg Brook is a puddle-clay core which is long, thick, and deep from the top of the embankment down to greatest depth of the trench, which was sunk to below the surface. A house was built in 1912 for the reservoir manager, which included a tower so the manager could look down and view activity on the site. This was last used for its intended purpose in the 1950s, and after some time as a place for Yorkshire Water employees to stay, the house was sold off to a private owner in 2010.
The reservoir was built to accommodate the supply from Hagg Brook, Edgecliff Brook, Shaw Brook and Knall Brook. Originally, it had also been intended to supply the reservoir from Thickwoods Brook, but after some "considerable litigation", Thickwoods Brook was given over to supply the Sheffield Corporation's Langsett Reservoir, so Midhope was then designed to be slightly smaller in capacity than originally intended.
The westernmost portion of the reservoir is within the Peak District National Park. The reservoir is designated as an upland reservoir which is now part of Yorkshire Water's holdings, and supplies water directly for treatment, and also provides water to Underbank Reservoir which acts as a compensation reservoir.