Mi Macro Periférico
Mi Macro Periférico is the second BRT line in the Guadalajara metropolitan area. It runs on along the Anillo Periférico Manuel Gómez Morin from its crossing with the Artesanos Avenue until the Solidaridad Iberoamericana Avenue, commonly known as Carretera a Chapala. It has a total of 42 stations between Carretera a Chapala and Barranca de Huentitán. The line has connections with line 1 and line 3 of the Guadalajara light rail system, lines 1 and 4 of SITREN and Mi Macro Calzada.
Its main stations are: "Independencia Norte", which connects with the first BRT line, "", "Periférico Norte", which connects with of the light rail and Mi Transporte Eléctrico, "Periférico Belenes", which connects with of the light rail, "Vallarta", which connects with Line 1 and 1B of SITREN, and "Periférico Sur", which connects again with of the light rail.
History
In 2013 the government of Aristóteles Sandoval presented the proposal of retaking the BRT project in Guadalajara with the Peribús, a line of articulated buses that would run along the Anillo Periférico, from Carretera a Chapala until the Tonalá Centre with a route of around. The idea entered planning stage, and in 2015 it was formalised, stating that it would have 97 stations on which around 182 buses, 12 metres long, would service. It was expected to have a demand of daily passengers, the operation would be joint between SITEUR and the Alianza de Camioneros de Jalisco.The complexity of the project caused the construction and operation plans to be delayed, and in 2016 it was speculated that the project would not be taken further during Sandoval's administration due to a lack of budget. That same year the initial project was cut, by tracing a route between the Belisario Domínguez Avenue and Carretera a Chapala, thus the project only got as far as instead of the initial. Even then, Sandoval's intention stood, assuring that it would move 370 thousand daily passengers. Due to budget, construction, and infrastructure issues, the project was paralysed.
In February 2019 the state government, headed by Enrique Alfaro Ramírez, inserted in the state budget an entry for 200 million pesos to begin the repaving works of Periférico with the objective to retake the works of the Peribús, using as a base the 41.5 kilometres trace proposed in 2016. In November 2019, the works for the first stage of the transport system started, which by the time got renamed to Mi Macro Periférico, said project was inaugurated on 30 January 2022, by the state governor. The system has connections with the lines 1 and 3 of the light rail, the line 1 of Mi Macro and the lines 1, 1B and 4 of SITREN.