Metropolitan Water Board
The Metropolitan Water Board was a municipal body formed in 1903 to manage the water supply in London, UK. The members of the board were nominated by the local authorities within its area of supply. In 1904 it took over the water supply functions from the eight private water companies which had previously supplied water to residents of London. The board oversaw a significant expansion of London's water supply infrastructure, building several new reservoirs and water treatment works.
The Metropolitan Water Board was abolished in 1974 when control was transferred to the Thames Water Authority, which was subsequently re-privatised as Thames Water.
Background
Water supply in the London area was regulated by local acts and royal charters on a piecemeal basis from 1543.Through amalgamation, by 1830 there were six companies supplying water north of the Thames:
- The New River Company incorporated in 1619
- The Hampstead Water Company, incorporated around 1730
- The Chelsea Waterworks Company, incorporated 1723
- The West Middlesex Waterworks Company, incorporated 1806
- The East London Waterworks Company, incorporated 1807
- The Grand Junction Waterworks Company, incorporated 1811
- The Lambeth Waterworks Company, incorporated 1785
- The Kent Waterworks Company, incorporated 1809
- The Southwark Water Company, incorporated around 1760
- The Vauxhall Water Company, incorporated 1805
Formation
The board was created by the provisions of the . The board, which first met on 2 April 1903, had 67 members; 65 of these were nominated by local authorities, who appointed a paid chairman and vice-chairman. The nominating bodies were:- In the County of London: 14 members nominated by the London County Council, 2 members by the City of London, 2 by the City of Westminster and 1 member by each of the remaining 27 metropolitan boroughs.
- In Essex: 1 member nominated by Essex County Council, 1 member by West Ham County Borough and 4 members nominated by 9 urban district councils.
- In Kent: 1 member nominated by Kent County Council, and 1 member jointly nominated by 8 urban district councils.
- In Middlesex: 1 member nominated by Middlesex County Council, and 6 members nominated by the borough of Ealing and 17 urban district councils.
- In Surrey: 1 member nominated by the Surrey County Council, and one nominated jointly by the Borough of Richmond and 7 urban district councils.
- In Hertfordshire: 1 member nominated by Hertfordshire County Council.
- 1 member of the Conservators of the River Thames.
- 1 member of the Lee Conservancy Board.
Companies acquired
The board compulsorily acquired the eight major London water companies:- The New River Company
- The East London Waterworks Company
- The Southwark and Vauxhall Waterworks Company
- The West Middlesex Waterworks Company
- The Lambeth Waterworks Company
- The Chelsea Waterworks Company
- The Grand Junction Waterworks Company
- The Kent Waterworks Company
The Metropolitan Water Board officially took over from the private water companies on 24 June 1904, except for the New River Company which was transferred on 25 July.
Area of the board
At, the board's area, or "limits of supply", was considerably larger than the administrative County of London. The limits were to be the same as the area supplied by the various undertakings acquired with the addition of the parishes of Sunbury, Middlesex and Chessington, Surrey. It comprised the entire county of London and much of Middlesex, with outer boundaries at Cheshunt in Hertfordshire, Loughton and East Ham in Essex, Dartford and Foots Cray in Kent, and Malden, Surbiton, Esher and Kingston upon Thames in Surrey. The 1911 Encyclopædia Britannica described "Water London" as "an irregular area extending from Ware in Hertfordshire to Sevenoaks in Kent, and westward as far as Ealing and Sunbury."Water sources and supplies
The Metropolitan Water Board abstracted water from the River Thames; the River Lea; from springs and wells in the Lea valley, Kent, and in the southern district; from the Hanworth gravel beds; and from Hampstead and Highgate ponds. The daily and total volume of water supplied by the MWB in 1912–13 and 1920–21 was as follows:Note: 1 million gallons is 4546.1 m3.
The Thames Conservancy placed limits on the abstraction of water. The average daily abstraction was limited to 300 million gallons per day. When the flow of the Thames over Teddington Weir was less than 170 million gallons a day no abstraction was authorised except with the permission of the Local Government Board. If the flow was less than 140 million gallons no abstraction was allowed. If the flow over Penton Hook weir was less than 285 million gallons a day no abstraction above Penton Hook was allowed. The maximum abstraction from the river in any one day was limited to 1,200 million gallons.
The MWB gave a water supply to the Croydon Corporation, Richmond Corporation, Cheshunt Urban District Council, and the Hertfordshire and Essex Water Company.
Final years (1965–1974)
Upon the reorganization of local government in Greater London in 1965, the board’s constitution was amended by the London Government Order 1965 and from 1 November 1965 until its abolition on 1 April 1974, the board had 39 members, appointed by the constituent authorities:The Greater London Council appointed six members, while the Common Council of the City of London, 26 of the London borough councils, the county councils of Essex, Kent, Surrey and Hertfordshire, the Thames Conservancy and the Lee Conservancy Catchment Board all appointed one member each.
While there were a number of local authorities wholly or partly within the board’s area which were not directly represented on the board, they were indirectly represented through either the Greater London Council or appropriate county council.
The term of office of members of the board was three years. The chairman and vice-chairman were elected by the board on an annual basis.