Mary MacKillop Bridge


The Mary MacKillop Bridge is a bascule bridge in Adelaide, Australia that carries the Dry Creek-Port [Adelaide railway line] over the Port River.
In July 2005, Abigroup was awarded a contract to build a railway bridge and the adjoining Tom 'Diver' Derrick Bridge to carry the Port [River Expressway] over the Port River. The bridge was built as part of a project to divert the Dry Creek-Port Adelaide line away from the Rosewater loop and bypass the Outer Harbor and [Port Dock lines|suburban network].
It was opened on 1 August 2008 by Premier Mike Rann.