Mambilla Hydroelectric Power Station
The Mambilla Hydroelectric Power Station is a 3,050 MW hydroelectric power project under development in Nigeria. When completed, it will be the largest power-generating installation in the country, and one of the largest hydroelectric power stations in Africa.
Location
The power station is located in Kakara village, in Taraba State, Nigeria. This is near the town of Gembu, close to the border with Cameroon. The power station sits across the Donga River, and consists of four dams and two underground power houses. Gembu is approximately, by road, southeast of Wukari, the nearest large town, all in Taraba State.Overview
Constructed in 1982, the main Mambilla Dam is a large roller-compacted concrete dam and reservoir at above sea level. From this dam, water is diverted off the reservoir towards the western side of the plateau through four hydraulic tunnels totaling, intercepted by four smaller dams: Nya, Sum Sum, Nghu, and Api Weir.Beyond these dams, the tunnels lead into a drop shaft tunneled down through the rock to a massive underground power station with a generating capacity of. Passing through a short tunnel, the water then exits the base of the plateau and flows into a tributary river that rejoins the Donga River downstream of the plateau.
Development
On 30 August 2017, the Federal Executive Council approved the award of the construction contract to a consortium of Gezhouba Group, Sinohydro, and CGCOC Group.The Mambilla Hydropower Plant Project has been planned for over 40 years. It is expected to connect to four dams across the Donga River. The first preliminary feasibility study for the Mambilla Hydropower Plant was reportedly carried out by Moto Columbus in 1972, but attempts to construct the power station up to now have been unsuccessful.
Funding
The total cost of the project is budgeted at US$5.8 billion. The Exim Bank of China has agreed to lend 85 percent towards the construction. The funds will be paid directly to the construction consortium in tranches, as the work progresses. The Federal Government of Nigeria has committed to contribute 15 percent of the construction costs.Construction
In November 2017, there were attempts to start construction of this power station. However, due to various constraints, including landslides, and a lawsuit at the International Court of Arbitration, the project stalled again. In February 2020, following the resolution of the lawsuit, there were fresh attempts to resume construction.Construction is expected to take at least seven years from start to finish, due to the technical complexity of the project. A more realistic completion date is 2030.