Malaysia Federal Route 23


Federal Route 23, or Jalan Muar–Tangkak–Segamat, is a federal road in Johor, Malaysia, connecting Segamat in the north and Parit Bunga in the south. It is also a main route to North–South Expressway Southern Route via Tangkak Interchange.

Route background

The Kilometre Zero of the Federal Route 23 starts at Parit Bunga, at its interchange with the Federal Route 5, the main trunk road of the west coast of Peninsular Malaysia.

History

In 1914, two roads Federal Route 1 and Federal Route 23 build for connecting between Segamat and main towns in Johor, which both roads completed in 1939. The land transportation mode become more frequently since it is more convenient, making rivering transportation mode is not using anymore. Pengkalan Esah now become place of Segamat Second Bridge J217.
Since Federal Route 23 opening in 1939, many improvements had made for FT23, many sharp corners in Kampung Lubuk Batu, Kampung Batu 7, and Kampung Bukit Tunggal are straightened. However, Federal Route 23 still well known with many sharp corners, especially the dead corners in Tangkak district are still not straighten until the upgrading of the Federal Route 23 from Segamat to Tangkak section. The Kampung Batu 7 old section formed the J43 Jalan Bypass and J264 Jalan Universiti.
In 1997, Minister of Works, Datuk Seri Samy Vellu, announced to build Segamat–Muar Expressway as the new expressway parallel with existed Federal Route 23. However, this project is canceled because of the 1997 Asian financial crisis. As the replacement, the upgrading of the roads from Segamat to Tangkak began in November 2011.
To reduce the congestion in Tangkak, Tangkak bypass between Tangkak Industrial Area and Johor Matriculation College is planned to build to reduce the traffic flow in Tangkak and make traffic in Tangkak smoother.

Road closure for bridge repair near to Mount Ledang junctions

The sections near near to Mount Ledang junctions is restricted to under than 36 tans to repair the bridge.

Features

At most sections, the Federal Route 23 was built under the JKR R5 road standard, allowing maximum speed limit of up to 90 km/h.

Upgrading of the roads from Segamat to Tangkak

On 7 December 2007, the federal government decided to upgrade the 40-km stretch from Segamat to Tangkak from a two-lane road to a four-lane road. The road was completed around 2015.Meanwhile the second section from Jementah to Just before the Gunung Ledang Resort Waterfall entrance was completed in December 2020

Construction of the Segamat–Tangkak–Muar Highway

Construction of the 63-km Segamat–Tangkak–Muar Highway, estimated to cost between RM750 million and RM770 million, was to begin in November 2011. The road upgrading project will be carried out in five packages including an upgrading 14 bridges along the route. Package 1b and 2 of the highway were completed on 2015.

Junction and town lists

The entire route is located in Johor.