Keretapi Tanah Melayu


Keretapi Tanah Melayu Berhad or colloquially referred to simply as KTM, is the main railway operator in Peninsular Malaysia. The railway system dates back to the British colonial era, when it was first built to transport tin. Previously known as the Federated Malay States Railways, the Malayan Railway Administration, and the Malayan Railway, KTM acquired its current name in 1962. The organisation was corporatised in 1992, but remains wholly owned by the Malaysian government.

History

In 1948, the FMSR was renamed the Malayan Railway. The railways had been devastated by the Japanese invasion of Malaya, and efforts were taken to rebuild the two main lines, but many branch lines were abandoned in the process.
The MR began to modernize the equipment with the ordering of diesel locomotives and railcars to replace steam-hauled services, and the first diesel locomotive entered service in 1957. The railcars entered service in 1960, initially on short-haul services. Rapid services were introduced later, cutting travel times from Singapore to Kuala Lumpur down to six hours, which was competitive at the time. MR and later KTM continued ordering more diesel locomotives through the decades, rendering the old steam locomotives redundant. The last steam locomotive was withdrawn from service in 1974.
Malayan Railways also operated an air service from 1954 to 1958, known as Federation Air Service. The service was transferred to Malayan Airways in March 1958.
The 1970s saw the closure of many branch lines, such as the Batu Arang branch in 1971 and the historic Taiping to Port Weld branch in 1972. The Port Dickson branch was converted to freight-only operation in 1972, although seasonal passenger service did continue for a short while. However, construction did continue for a new line to the Subang Airport used to transport fuel, which opened in 1980.
Railbuses were introduced in the 1980s for short-haul commuter services. They were deployed in the Klang Valley, on Kuala Lumpur to Ipoh, Ipoh to Butterworth, Gemas to Mentakab and Kulai to Singapore services. On certain routes such as Kulai to Singapore, the railbuses were faster than conventional trains, and in this instance saved travel time of 15 minutes. They lasted until the introduction of KTM Komuter in 1995, which took over commuter services in the Klang Valley except for Kulai to Singapore, where the service from Johor Bahru to Singapore was supposed to be separated into the commuter train service utilising electric multiple units, but the decision was destroyed in 2010 with the relocation of the railway terminus to Woodlands Train Checkpoint.
KTM was corporatised in 1992, with all assets now under the ownership and management of the Railway Assets Corporation. The company runs as a private enterprise although owned and subsidized by the Malaysian government. There were attempts by private companies to take over the operations since then, but such proposals were rejected by the Malaysian government.
The 1990s saw the start of another modernization programme. Proposals were made to electrify and double-track the West Coast Line, which started with the Klang Valley area. Electric trains made their debut on 3 August 1995 with KTM Komuter, with services from Port Klang to Sentul and Rawang to Seremban. Under this programme, existing stations were renovated or rebuilt, and new stations were built.
The programme was faced with delays throughout the 2000s, with the government postponing many electrification projects. However, from 2007 onwards there was a renewed effort to electrify the rest of the West Coast Line. The completion of such electrification projects from to to date has allowed the commencement of electrified intercity services in the form of KTM ETS. As the projects were completed in stages, the KTM Komuter and KTM ETS services were expanded over the years to take advantage of the upgraded lines. The East Coast Line, which had not seen upgrades for many years, saw upgrades in the form of rehabilitated track, new Diesel multiple units. and many refurbished and rebuilt stations.

Railway network

The 1000mm gauge network consists of two main lines and several branch lines.

West Coast Line

The West Coast Line runs from the Malaysia-Thailand Border, where it connects with the State Railway of Thailand, to Woodlands Train Checkpoint in Singapore, serving the West Coast states of Peninsular Malaysia. The line runs through most of the major stations in Peninsular Malaysia, such as JB Sentral, Gemas, KL Sentral, Ipoh, Butterworth and Padang Besar railway station.

Branch lines

There are several branch lines running from the West Coast Line. Some are mixed traffic, catering to passenger and freight traffic while others only cater to freight trains.
  • Kuala Lumpur - Port Klang, with further branches:
  • * Subang Jaya - Terminal Skypark
  • * Port Klang - Pulau Indah
  • Putra - Batu Caves
  • Butterworth - Bukit Mertajam, with a further branch:
  • * Butterworth - North Butterworth Container Terminal
  • Kempas Baru - Tanjung Pelepas
  • Kempas Baru - Pasir Gudang

East Coast Line

The East Coast Line branches off from the West Coast Line at Gemas, running to Tumpat in Kelantan, serving two of Peninsular Malaysia's East Coast states, namely Pahang and Kelantan. Despite its name, it only meets the coast when it reaches Tumpat railway station. It runs through the interior, often through deep jungle, thus earning the nickname Jungle Railway.

Branch line

There is only one branch line on the East Coast Line, between and in Kelantan which was completed in 1921. However, since 1978, this branch line has not been in use.

Infrastructure

The total network spans. The total length of the network was, however due to the closure and subsequent removal of the section of tracks between Tanjong Pagar railway station and Woodlands Train Checkpoint, the network is now shorter.
The West Coast Line is double tracked and electrified between Padang Besar and JB Sentral, along with all branch lines used for passenger service along this stretch. As part of the upgrades, all level crossings have been removed and modern signaling installed.
The stations along this line are a combination of heritage stations from the colonial era, such as and stations, and modern stations that were built when the line was double-tracked, such as,, and stations.
The East Coast Line is single tracked and not electrified. Having not seen many upgrades over the years, the line is considerably less modern than the upgraded sections of the West Coast Line. Level crossings are still prevalent, and the traditional token signaling system is still used. The stations along this line are older and smaller. Although the line will remain single-tracked, worn track has been replaced, and many stations also being upgraded.
Most of the lines use concrete sleepers, which replaced wooden sleepers from 1982 for the Kerdau-Jerantut and Sungai Yu-Tumpat lines and became more widespread after upgrading works in recent years.
The network now exclusively use concrete sleepers.

Rolling stock

ClassImageManufacturerYear builtBuiltNumbersTypeStatus
20

Depots

Northern Depot

  • Padang Besar Depot
  • Bukit Tengah Depot
  • Batu Gajah Depot:
  • * ETS Depot
  • * Central Workshop

Central Depot

  • KL Sentral Depot
  • Port Klang Depot
  • Sentul Depot

Southern Depot

  • SCS Seremban Depot
  • Gemas Depot
  • Kempas Baru Depot

East Coast Depot

  • Tumpat Depot
  • Kuala Lipis Depot

Services

As a national railway company, KTM is involved in the business of providing rail-based transportation. This can be divided into four major services:

KTM Intercity

KTM Intercity is the brand name for long-haul passenger trains that connect cities and major towns served by the KTM rail network.
The service is provided using conventional locomotive-hauled coaches and newer diesel multiple units. Services span the length of East Coast Line, and a small portion of the West Coast Line network. Current daily services include:

Locomotive-hauled coaches:
DMUs:
  • Shuttle Timuran from to in Kelantan with:
  1. Gemas -
  2. Kuala Lipis - Tumpat
  3. Kuala Lipis -
  4. Gua Musang - Tumpat
  5. - Tumpat
It is possible for customers to rent specialized coaches for event management, conferences and even weddings.
KTM Intercity has also been involved in various types of collaborations, joint-promotions, and cross-promotions with all state-level tourism bodies, travel agencies and travel-related industry players in developing rail packages for group travellers.

KTM ETS

The KTM ETS, an abbreviation for Electric Train Service, is a higher-speed rail intercity train service that uses electric multiple unit trainsets on the same metre-gauge like the rest of the railway. The service originally started 2010 and has currently expanded, with the last extension opened on 12 December 2025. The trains travel up to on electrified lines, although they are designed to be capable of up to.
It currently operates on the main West Coast Line from, Johor to, Perlis as well as the branch line to, Penang. The train service was recently extended down south towards JB Sentral, providing connections onward to Singapore via the KTM Intercity's Shuttle Tebrau service and the RTS Link in the future.
These services have reduced travel time as compared to the previous intercity services which ran on diesel, with a considerably lower top speed at around, and have brought a revival to intercity rail travel, which was previously beaten out by faster road and air options. Ridership for intercity rail service has more than doubled in the past decade to over 8.75 million in 2024.

KTM Komuter

KTM Komuter is a commuter rail service serving the Klang Valley, and the Greater Penang Conurbation in the north.
The central sector in the Klang Valley consists of the and. The KL Sentral-Terminal Skypark Line is an airport train service linking KL Sentral to the Sultan Abdul Aziz Shah Airport in Subang, Selangor. The entire Central Sector fleet presently consists of the KTM Class 83 and KTM Class 92 trainsets.
The KTM Komuter Northern Sector consists of two routes, namely the Butterworth-Ipoh Line and Padang Besar-Butterworth Line.
Plans are underway for a future Komuter service in the southern sector, following the recent completion of the Gemas-Johor Bahru Electrification and Double Tracking project.

KTM Kargo

KTM Kargo provides cargo conveyance services, with a network that spans almost the whole of the KTMB rail network. It is accessible from seaports and Inland Container Terminal as well as industrial centres.
Cargo services are a major contributor to KTM's overall revenue.
Currently, there are 45 cargo train services daily with 23 routes daily, of which about 70% are concentrated in the Northern sector. KTMB runs 37 freight train services daily of which about 80% are concentrated in the Northern sector.
The services include
  • Bukit Ketri - Kuang
  • Padang Rengas - Batu Caves
  • Padang Rengas - Gelang Patah
  • Kanthan - Padang Jawa
  • Tasek - Gelang Patah
  • Prai - Padang Besar
  • Pelabuhan Klang - Prai
  • Pelabuhan Klang - Padang Besar
  • Pelabuhan Klang - Ipoh
  • Pelabuhan Klang - Pasir Gudang
  • North Port - West Port
  • West Port - North Port
  • PTP - Pasir Gudang
  • Prai - Thungsong
  • Prai - Surathani
  • Prai - Padang Besa -
  • Pelabuhan Klang - Hatyai
  • Sungai Way - Bangkok
  • Prai - Sungai Buloh
  • Gurun - Butterworth
Main commodities carried by rail comprise the following:
  1. Maritime containers
  2. Landbridge cargos
  3. Cement
  4. Sugar
  5. Gypsum
  6. Chemicals
Generally, cargo is moved either in open or covered wagons. As of 2025, covered wagons have been replaced with containers to allow for flexibility i.e. goods can be dismounted from the train and delivered directly to customers' premises.

Non-rail subsidiaries

KTM operates several non-rail subsidiaries. Though considered as non-core businesses, KTMB has benefited from these two operations, which are:
  • Multimodal Freight
Multimodal Freight Sdn. Bhd., incorporated in 1988, was licensed as a government approved Container Haulier in 1991, and went on to obtain the Government approved Multimodal Transport Operator status in 1999. The company operates a fleet of 225 Prime Movers and 1,300 trailers of both 20-foot and 40-foot configurations. The fleet is deployed at all major seaports and the inland ports of Ipoh and Nilai.KTM Distribution
Its core business was in the provision of express parcel distribution services to the commercial, industrial and administrative sectors and operated within Malaysia and Singapore. Parcel distribution previously carried out via parcel train cars attached to intercity services where items like parcel and motorbikes could be carried, but this practice has since moved to trucks after rail modernisation and the closure of Tanjong Pagar Railway station in Singapore. Previously, KTMD was also licensed by the Malaysian Communications & Multimedia Commission as a courier service provider, which enabled it to carry letters and documents up to. On 1 November 2022, KTM Distribution announced it would be ending its service after 38 years of operations.

Modernisation

Since the corporatisation of KTMB, a programme of modernization has been underway. In 1989, it embarked on the double-tracking and electrification of the trunk line between Rawang and Seremban, the branch lines between Batu Junction and Sentul and between Kuala Lumpur and Port Klang, allowing KTM Komuter services to start running in 1995. Successive double tracking projects have allowed for expansion of electrification to intercity services in the form of the KTM ETS. The entire portion of the West Coast Line that is used for passenger service, has been fully electrified as of 12 December 2025.

Completed projects

  • Rehabilitation of long metre-gauge tracks from Paloh to Singapore and from Slim River to the main Seremban line in Malaysia
  • Electrification and double tracking of the Rawang-Seremban route
  • Electrification and double tracking of the Kuala Lumpur-Port Klang railway route, including spur lines to Subang Jaya and Sentul
  • Construction of railway bridges, road over bridges and underpasses along the Rawang-Kajang route
  • Construction of railway bridges, road over bridges and underpasses along the Kajang-Seremban route
  • Widening of railway tunnels near Seremban
  • Construction of railway culverts and box pushing along the Nilai-Seremban route
  • Track linking Port Klang to Pulau Indah
  • Construction of the Port of Tanjung Pelepas, a rail link in Johor
  • Track works at Kuala Lumpur Sentral station
  • Electrification and double tracking of the Rawang-Ipoh route
  • Electrification and double tracking of the Sentul-Batu Caves route
  • Electrification and double tracking of the Seremban-Gemas route
  • Electrification and double tracking of the Ipoh-Padang Besar route
  • Construction of the Subang Jaya-Terminal Skypark route
  • A new integrated station named Penang Sentral built which integrates ETS, KTM Komuter, LRT, bus and ferry services in one building at Butterworth.
  • Electrification and double tracking of Gemas-Johor Bahru route
  • Rehabilitation of tracks in the Klang Valley, Phase 1
  • Rehabilitation of tracks Gemas-Mentakab
  • Rehabilitation of tracks Jerantut-Gua Musang
  • Rehabilitation of tracks Gua Musang-Tumpat

Current projects

  • Rehabilitation of tracks in the Klang Valley, Phase 2

Proposed projects

  • Outer Ring Railway Service to connect all suburbs in the Klang Valley without going through the city centre. Superseded by MRT Circle Line.
  • Construction of the Subang Jaya-Sungai Buloh Link which will act as a freight bypass to allow freight trains to avoid having to enter the Kuala Lumpur Komuter network. Works are divided into two phases; Phase 1 is from Subang Jaya to Terminal Skypark; Phase 2 is from Terminal Skypark to Sungai Buloh. Phase 1, currently known as the, was completed in 2018 but operations have been suspended.
  • Extension of the ETS service to Hat Yai, Thailand.
  • Komuter rail from Pasir Gudang to Port Tanjung Pelepas. Proposed 13 stations along the route linking Iskandar Puteri, Johor Bharu to Pasir Gudang.
  • Rehabilitation of railway track between Rantau Panjang and Pasir Mas.

Board of directors

Chairman: YBhg. Datuk Musa Hj Sheikh FadzirChief Executive Officer : YBrs. Encik Mohd Rani Hisham SamsudinNon-Independent, Non-Executive Director: YBrs. Encik Iszad Jeffri IsmailIndependent Non-Executive Director: YBrs. Encik Md Silmi Abd Rahman, YBhg.Datuk Seri Yew Teong LookHeads of Strategic Business Units;
  • *KTM Intercity: Puan Nurul Azha Mokmin
  • * KTM Komuter: Pn Suhaila Saad
  • * KTM Kargo: Encik Hezri Ariffin