M70 motorway (Hungary)


The M70 motorway is a motorway in Hungary, connecting the M7 motorway to the A5 motorway in Slovenia. The road is 21 km long and has a speed limit of 130 km/h. The last section was completed in 2006. After the opening of the last missing sections of the M7 on August 19, 2008, there is a direct motorway link from Budapest to Slovenia. The expressway originally consisted of two lanes between Letenye and Tornyiszentmiklós interchanges. As a four-lane, full profile motorway, it opened on December 13, 2019. It was built by the Colas Group.

Route description

Maintenance

The operation and maintenance of the road by This activity is provided by this highway engineer.

Payment

Since 2015, the M70 motorway is fully tolled road. Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes ;
2, county vignettes ; the highway can be used instead of the national sticker with the following county stickers:
Type of county vignetteAvailable section
Zalafull length

Significant structures

; Bridge
  • Korongi Bridge over the M7 motorway