The plant spans over an area of 4.5 hectares over a 10-hectare plot of land. Around 0.5 hectare of the land is used as a farm.
Technical details
The plant is managed by Onyx Ta-Ho Environmental Services Co., Ltd. It has a capacity of treating 900 tons of garbageper day from its two boilers. It also has a power generating unit with an installed capacity of 28 MW. As of 2020, it received a total of 26,070 tons of garbage annually and incinerated 25,420 tons of them. The chimney has a height of 120 metres .