Lombard Road power station supplied electricity to the Battersea area of South-East London from 1901 to 1972. It was owned and operated by the Borough of Battersea until the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1910s and the 1930s. The station was decommissioned in 1972.

History

In 1896 the vestry of Battersea applied for a provisional order under the Electric Lighting Acts to generate and supply electricity to the parish. The was granted by the Board of Trade and was confirmed by Parliament through the Electric Lighting Orders Confirmation (No. 5) Act 1896. The power station was built between Lombard Road and Harroway Road in Battersea.

Equipment specification

The power station opened in 1901 with a max demand of 664kW. It compromised a number of generators
  • 2x Willans & Robins steam engines driving 192kW generators.
  • 1x Willans & Robins steam engine driving 400kW generator.
In 1923 the generating plant comprised:
Coal-fired boilers generating up to 207,000 lb/h of steam, the boilers fed steam to:
The total generating capacity was 12,350 kW.
A variety of electricity current was available to consumers:
  • Direct current at 230 and 460 Volts,
  • 3-phase, 50 Hz AC at 400 Volts,
  • 3-phase, 50 Hz AC at 6,000 Volts for industrial users.
In 1928 a new 10MW Fraser and Chalmers 3000rpm turbo alternator powered from 2x Babcock and Wilcox marine boilers with integral superheaters designed to evaporate 65,000 Ib. to 95,000 lb. of water per hour from feed water at a temperature of 175 deg. Fah. into steam at a pressure of 325 lb. per square inch. The turbo alternator drove a General Electric Company three-phase, 6.6kV, 50Hz alternator. The normal rating is 12,500 kVA but capable of developing an overload of 25 per cent. for two hours.

New plant 1930s

A new generator and switch house were added to the power station in 1931.
By 1954 the plant at Lombard Road was in its final configuration and comprised:
  • Boilers:
  • * 4 × Babcock and Wilcox boilers with chain grate stokers, each 65,000 lb/h, steam conditions 315 psi and 750 °F,
  • * 2 × Babcock and Wilcox boilers with chain grate stokers, each 125,000 lb/h, steam conditions 315 psi and 750 °F,
The boilers had a total evaporative capacity of 510,000 lb/h.
Coal was delivered by road and by barge to Grove Wharf on the Thames. From the wharf it was delivered to the power station by an inclined conveyor across Lombard Road.
The boilers supplied steam to:
  • Turbo-alternators:
  • * 1 × Westinghouse 5 MW turbo-alternator, low pressure set, generating at 6.6 kV. Steam at 190 psi and 520 °F via a reducing valve.
  • * 1 × Fraser & Chalmers-GEC 5 MW turbo-alternator, low pressure set, generating at 6.6 kV. Steam at 190 psi and 520 °F via a reducing valve.
  • * 1 × Fraser & Chalmers-GEC 30 MW turbo-alternator, high pressure set, generating at 6.6 kV,
  • * 1 × Fraser & Chalmers-GEC 10 MW turbo-alternator, high pressure set, generating at 6.6 kV,
The completed total installed generating capacity was 50 MW, with an output capacity of 42 MW.
Condenser cooling water was drawn from the River Thames.

Operations

Operating data 1904–20

The operating data for the period 1904–20 is shown in the table.
YearElectricity sold GWhIncome from sales of current £
19041.357
19083.076
19136.21446,077
19146.640
191914.19197,022
19209.817

Operating data 1921–24

A breakdown of the operating data for the period 1921–24 is shown in the table:
The growth of demand and use of electricity is evident.
Under the terms of the Electricity (Supply) Act 1926 the Central Electricity Board was established in 1926. The CEB identified high efficiency 'selected' power stations that would supply electricity most effectively; Lombard Road was designated a selected station. The CEB also constructed the National Grid to connect power stations within a region.

Operating data 1934–46

Lombard Road power station operating data for 1934–46 is given below.
YearLoad factor per centMax output load MWElectricity supplied GWhThermal efficiency per cent
193455.695
193540.207
193647.143
193739.716,72052.342
194621.333,70062.90616.10

The larger amount of electricity supplied reflects the capacity of the new generating plant installed in the early 1930s.
The British electricity supply industry was nationalised in 1948 under the provisions of the Electricity Act 1947. The Borough of Battersea electricity undertaking was abolished, ownership of Lombard Road power station was vested in the British Electricity Authority, and subsequently the Central Electricity Authority and the Central Electricity Generating Board. At the same time the electricity distribution and sales responsibilities of the Battersea electricity undertaking were transferred to the London Electricity Board.

Operating data 1954–71

Operating data for the period 1954–71 is shown in the table:
YearRunning hours or load factor Max output capacity  MWElectricity supplied GWhThermal efficiency per cent
195411904214.91413.17
195534884242.50214.93
19568484211.2212.20
195712614217.25812.91
195810064214.23613.45
19616.9%4225.2415.26
19627.0%4225.84114.84
196310.42%4210.4215.10
19669.8%4236.09113.62
19679.8%4236.01614.16
196812.1%4244.55514.31
19695.1%4218.61310.37
19704.5%3816.71413.67
19716.3%2821.01511.92

The declining use of the station at lower thermal efficiencies is evident.
The amount of electricity supplied by Lombard Road power station over its operating life was:

Closure

Lombard Road power station was decommissioned in 1972. The buildings were subsequently demolished and the area has been redeveloped with housing and commercial units.