Line 7 (Shenzhen Metro)
Line 7 of the Shenzhen Metro has a length of and a total of 29 stations. It connects SZU Lihu Campus to Tai'an, travelling East–West across Shenzhen in a "V" shape. Construction started on 23 October 2012, with track laying complete in April 2016. The line started service on 28 October 2016.