Line 4 (Foshan Metro)
Line 4 of Foshan Metro is a line under construction in Foshan. The first phase of the line will run in an L-shaped northwest-east direction, connecting Beijiang Dadao in Sanshui District with Gangkou Lu in Nanhai District, with 33 stations and kilometers of track. Construction started on 15 January 2022.
The line is expected to operate 6 car type B trains with a maximum speed of 100km/h, and will be fully automated and driverless.