Line 3 (Nanjing Metro)
Line 3 is a north–south line on the Nanjing Metro. The line opened on April 1, 2015, running from to. Currently, the line contains 31 stations spanning a total of. Between and, it runs parallel to Line 1.
Phase 3 of Line 3 started construction in 2021. The extension is 3.3 km with 2 new stations. It opened in December 19, 2025.