Line 1 (Metrovía)


Lane 1 of Metrovia, Opened to the public on July 30 of 2006, it is the first Line of a total of 7 to operate in Metrovia's BRT System.

Stations

South to North

Currently in Service:

North to South

  • Terminal de Integración Río Daule
  • Base Naval
  • Ciudadela La Atarazana
  • Hospital Luis Vernaza
  • Boca 9
  • La Catedral
  • Caja Del Seguro
  • La Providencia
  • El Astillero
  • Hospital León Becerra
  • Barrio Centenario
  • Barrio Cuba
  • Caraguay
  • Ciudadela La Pradera 1
  • Ciudadela La Pradera 2
  • Barrio Los Tulipanes
  • Guasmo Central
  • Ciudadela La Floresta 1
  • Ciudadela La Floresta 2
  • Guasmo Norte
  • Guasmo Sur
  • Terminal de Integración El Guasmo