Line 13 (Chengdu Metro)
Line 13 of the Chengdu Metro is a metro line in Chengdu, Sichuan, China. The first phase of the line officially opened on 16 December 2025. This entire section is underground.
History
- On 11 November 2019, construction on line 13 began.
- On 16 December 2022, Line 13 Phase 1 finished Sanguantang to Jiuyan Bridge Section tunnel construction, marking the success of the longest underwater/river tunnel work in Chengdu Metro history.
- On 13 January 2023, 15 stations finished structural construction and tunnel finished 62%, railroad finished 10%
- On 30 March 2023, Line 13 Jiuyan Bridge~Xinnanmen section's tunnel boring machine finished construction.
- On 20 September 2023, Line 13's first train is finished. This is Chengdu's second metro line to use driverless automatic trains.
- On 16 December 2025, Line 13 Phase 1 entered service.