Lake Champlain Bridge (2011–present)
The Lake Champlain Bridge is a vehicular bridge traversing Lake Champlain between Crown Point, New York and Chimney Point, Vermont. It replaced Champlain Bridge |an older bridge] that was demolished in 2009. The bridge was designed and constructed during an aggressive two-year schedule to minimize the social and economic impact of the original bridge's demolition. It is the only fixed-link crossing of Lake Champlain/Champlain canal between US 4 in Whitehall, to the south and US 2 at Rouses Point, to the north.
The main arch span was prefabricated off-site in Port Henry, floated by barge to the already-constructed approach spans, and then lifted into place on August 26, 2011. The completed bridge was originally scheduled to open on October 9, 2011, but this was pushed back around a month due to construction delays from underwater debris and record flooding.
The bridge opened to the public on Monday, November 7, 2011, following a ribbon-cutting ceremony.