Kuosheng Nuclear Power Plant
The Kuosheng Nuclear Power Plant or Guosheng Nuclear Power Plant, Second Nuclear Power Plant, was a nuclear power plant in Wanli District, New Taipei, Taiwan. The plant was the largest nuclear power plant in Taiwan.
Generation
The power plant could generate 16 billion kWh of electricity per year. Both boiling water reactors had been retired by 2023.History
1981
The power plant was commissioned in December 1981.2010
On 7 October 2010, Unit 1 of the plant was shut down for refueling starting at 12:49 a.m. and was synchronized back to the system on 31 October at 12:14 p.m. establishing a new record in Taiwan for the shortest nuclear power plant overhaul duration of 24.48 days.2011
On 17 May 2011, Taipower and New Taipei City Fire Department organized the very first compound disaster drill in Taiwan. This event was held at the Kuosheng Nuclear Power Plant and observed by President Ma Ying-jeou. The training scenario was based on the events of the Fukushima Daiichi nuclear disaster that occurred on 11 March 2011. A statement issued by Taipower indicated that in the worst-case scenario, where the plant experiences total power failure, saving lives would be top priority. In this scenario, the plant would be abandoned and seawater injected to prevent the meltdown of the nuclear core.2012
During routine maintenance of the power plant on 16 March 2012, the plant maintenance workers discovered problems with seven anchor bolts used to secure the bottom of the nuclear reactor to the steel-reinforced concrete substrate that holds the weight of the reactor. One bolt was broken, two were fractured and four were cracked. Taipower said that they would consult relevant agencies to analyze and fix the problem and add vibration-monitoring sensors near the reactor base for continuous monitoring.2013
The plant's number one nuclear reactor automatically shut down on Friday, 21 June 2013. The automatic shutdown occurred because protective device was activated when the generator's grounding signal showed abnormal activity. This was a result of a loose blade in the air damper that fell onto the busbar insulator between the generator and main transformer. The incident did not damage the reactor and there was no release of radioactivity. Taipower mitigated the event by re-securing the blade and replacing the related components. The power plant was back online by Sunday, 23 June 2013.2015
On 26 December 2015, reactor number one shut down unexpectedly due to a problem with its control systems.2016
On 16 May 2016, reactor number two was suspended following a fire caused by a short circuit. The incident occurred shortly after operations resumed following annual maintenance. In 2018, technical approval for a restart was given, but actual restart is subject to parliamentary approval.On 30 May 2016, one of the reactors suddenly shut down.