Kresty-2 Prison
Federal State Institution Pre-trial Detention Facility No. 1 of the Federal Penitentiary Service for the City of St. Petersburg and the Leningrad Oblast, unofficially known as Kresty-2 is a pretrial detention facility in Kolpino, Saint Petersburg. It was opened on December 22, 2017, and replaces the old Kresty Prison, from which it inherited its configuration, as well as its official and unofficial names.
History
In the 1990s, when the already old Kresty Prison was sometimes overcrowded two or three times more than normal, and its condition was already critical, many ideas about creating a new pretrial detention facility appeared in official and unofficial circles. In addition, one of the goals of the project was to move the pretrial detention facility out of the center of Saint Petersburg. Construction of the new prison began in 2007.Construction progressed slowly due to both underfunding and various technical and bureaucratic problems. A vacant lot near the October Railway, one kilometer from the Kolpino station, was chosen for construction. After preparing the territory and creating a deep pit, construction of the prison itself began. The buildings themselves were erected by 2010, but their delivery was delayed for many years. On December 22, 2017, the prison was formally opened.