Karaj Metro


Karaj Metro is a rapid transit system serving the city of Karaj, Iran. This system has 2 operating lines with 11 working stations. The planned system will include 6 lines and 85 stations.
Line 1 with 7 stations is an extension and a part of Tehran [Metro Line 5] with 7 operating stations in, connecting Hashtgerd to Garmdarreh. Line 2 opened partially on 27 February 2023 with 2 stations in, later that year another station was added, making the total stations of this line, 3. This line currently connects Golshahr boulevard to Taleghani boulevard, but is planned to connect Kamalshahr to Malard.

Lines

Line 1

Line 1 is a suburban rail line that consists of 7 stations.
StationConnectionsConditionBegan operation
GarmdarrehActive2017
AtmosferActive2006
Karaj file:Karaj_Metro_Line_2-2.png|center|frameless|50pxActive1999
Mohammad [Shahr Metro Station|Mohammad Shahr]Active2010
GolshahrActive2004
Shahid Fakhrizadeh Active2023
Shahid Sepahbod Qasem SoleimaniActive2019

Line 2

Line 2 consists of 24 stations.
StationConnectionsConditionBegan operation
KamalshahrUnder construction
KhorramdashtUnder construction
Daneshgah-e [Kharazmi Metro Station|Daneshgah-e Kharazmi]Under construction
Khiaban-e AzadiUnder construction
Moasseseh SeromsaziUnder construction
Chehel-o-Panj metri GolshahrActive2023
MianjaddehUnder construction
Dehghan vilaUnder construction
Rajaei ShahrActive2023
Meydan-e AjorlooUnder construction
Ayatollah TaleghaniActive2023
Chaharrah-e Haft-e [Tir Metro Station|Chaharrah-e Haft-e Tir]Under construction
Chaharrah-e MesbahUnder construction
Meydan-e Emam HosseinUnder construction
Karaj Active2025
SarhadabadUnder construction
Anbar-e NaftUnder construction
ManzariehUnder construction
Niroogah-e Montazer GhaemUnder construction
Bazar-e KhodroUnder construction
KanalUnder construction
13-e SharghiUnder construction
Serah-e AndishehUnder construction
Shahr-e [Malard Metro Station|Shahr-e Malard]Under construction