Kürpsay Dam
The Kürpsay Dam is a gravity dam on the river Naryn in Jalal-Abad Region of Kyrgyzstan, downstream from the Toktogul Dam. It is tall and creates a reservoir of which is active for power generation. The installed capacity of the power station is 800 MW. Construction was started in 1976, and the first electricity was supplied in 1981.