Interstate 95 in North Carolina


Interstate 95 is a part of the Interstate Highway System that runs along the East Coast of the United States from Miami, Florida, to the Canada–United States border at Houlton, Maine. The total interstate runs for 1,924 miles. In the state of North Carolina, the route runs for from the South Carolina border near Rowland to the Virginia border near Pleasant Hill. The highway serves the cities of Lumberton, Fayetteville, Wilson, Rocky Mount, and Roanoke Rapids. The route goes through a mostly rural area of the state, avoiding most of the major metro areas of North Carolina. It forms the informal border between the Piedmont and Atlantic Plain regions of the state.

Route description

I-95 is designated a Blue Star Memorial Highway for its entire length in North Carolina. It enters the state at the South Carolina state line, just north of the South of the Border attraction and just to the south of the town of Rowland. Traveling mostly northeasterly from the border, the freeway is joined in an overlap with US Highway 301 at exit 10, and then I-95/US 301 intersects I-74 in Lumberton. Together, I-95 and US 301 serve as the main route through town and pass over a bridge over the Lumber River just before exit 19. On the north side of town, US 301 leaves at exit 22. From there, I-95 turns due northward through a rural area of the state, past the small farming community of St. Pauls. I-95 serves as the eastern bypass of Fayetteville where I-95 Business, an older alignment, connects I-95 to downtown Fayetteville.
Remaining east of Fayetteville, I-95 passes over some unremarkable bridges over the Cape Fear River just north of the interchange with North Carolina Highway 87. I-95 Business returns to I-95 at exit 56 near Eastover, only to be followed by the northern terminus of Interstate 295 and southern terminus of U.S. Route 13 both of which are at exit 58.
I-95 intersects I-40 in Benson, then runs along bridges over the Neuse River between Four Oaks and Smithfield, the latter of which contains a notable retail outlet complex. Later, it has interchanges with US 264 in Wilson, and US 64 in Rocky Mount. I-40, US 264 and US 64 are three of the main east–west routes in the eastern part of the state, though a fourth route is proposed to cross I-95 in Smithfield. The last city it passes is Roanoke Rapids and another pair of bridges over the same river that city was named after before leaving the state near the unincorporated community of Pleasant Hill at the Virginia border. For most of the route, I-95 is paralleled closely by US 301. Besides the overlap with US 301 between exits 10 and 22, there are interchanges with US 301 at exits 1, 25, 40, 56, 90, and 107.

Services

The North Carolina Department of Transportation operate and maintain two welcome centers and six rest areas along I-95. Welcome centers, which have a travel information facility on site, are located at milemarkers 5 and 181 ; rest areas are located at milemarkers 47, 99, and 142. Common at all locations are public restrooms, public telephones, vending machines, picnic areas, and barbecue grills.
The North Carolina Department of Public Safety operate and maintain four truck inspection/weigh stations along I-95. The Robeson County stations are located on both north- and southbound at milemarker 24, each has one fixed scale. The Halifax County stations are located on both north- and southbound at milemarker 151, each has two fixed scales.

Dedicated and memorial names

I-95 in North Carolina feature numerous dedicated or memorialized bridges, interchanges, and stretches of freeway.
  • Blue Star Memorial Highway: official North Carolina honorary name of I-95 throughout the state.Congressman G K Butterfield Highway: official North Carolina name of I-95 from exit 173, in Roanoke Rapids, to the Virginia state line. It honors the U.S. Congressman who served from 2004 to 2022; it was dedicated on October 23, 2024.Dick Fleming Freeway: official North Carolina name of I-95 from exit 95, in Smithfield, to exit 97, in Selma, in Johnston County. He is honored as being a visionary businessperson, who help spur businesses along the two exits and the establishment of Carolina Pottery Store in 1983, which later grew to become Carolina Premium Outlets.Hector MacLean Highway: official North Carolina name of I-95 within Lumberton city limits.

History

Established in 1956, as part of the Federal-Aid Highway Act of 1956, I-95 was routed along or near existing US 301 throughout the state of North Carolina. By 1961, two stretches of the Interstate opened: from mile marker 56, in Fayetteville, to milemarker 107, near Kenly; the other a small bypass near St. Pauls. In 1964, the St. Pauls section extended further south into Lumberton; while another small stretch opened from US 158, in Roanoke Rapids, to the Virginia state line. In 1969, I-95 was extended further south from Roanoke Rapids to exit 145, in Rocky Mount. In 1973, I-95 was completed from St. Pauls to the South Carolina state line.
By the mid-1970s, I-95 had two gaps along its route in Fayetteville and Kenly–Gold Rock. In May 1978, two I-95 Bus. loops were established, both overlapping US 301, to help connect through the gaps and make I-95 appear as one continuous route throughout the state. In November 1978, the first gap to be completed was the Kenly–Gold Rock section. The final section of I-95 was completed in 1980, an easterly bypass of Fayetteville.

Tolls

The idea of tolling I-95 started in 2001 as a way to pay for improvements along the route. In 2003, state officials sought permission from the Federal Highway Administration for a plan that would cost $3 billion and put tollbooths every along the entire route. However, this was quickly killed by Governor Mike Easley, who did not support tolls.
In 2006, when the Virginia General Assembly passed the resolution calling for an interstate compact to build a toll highway, North Carolina was asked to join in on the compact of putting tolls along the entire length of I-95 in both states. Again, this was stopped by Easley, who did not see the benefit in such a compact and reiterated his opposition of tolls along I-95.
In 2010, North Carolina leaders revived talks on tolling I-95, submitting a request to the FHWA to toll the entire route. Approval would be considered after an environmental assessment and other conditions. Support has grown in a number of factors including the fact that the Interstate is mostly rural and used predominantly by out-of-state drivers.
On January 20, 2012, NCDOT received final approval of the environmental assessment for improvements along I-95 in North Carolina. The following recommendations were made:
It is estimated to cost $4.4 billion with recommendation that it should be paid through tolls. Construction would begin in two phases: phase 1 would begin in 2016 with tolls starting after completion; phase 2 would begin in 2019, which covers the remainder of the Interstate. With a possible 2019 start date for the tolls, NCDOT plans to install nine overhead toll collection sensors every with additional toll collection sensors at exits before tolls ; main toll stations will charge each while exit tolls will charge each. Gaps along the route, where no toll collectors are located, will allow local traffic to utilize the Interstate toll free. Though the toll rates have not been established, a NCDOT report suggest charging for cars in the phase 1 section, with a much lower rate of on phase 2 sections; which would work out to be $19.20 from border to border. Drivers that do not carry a toll transponder will have their license numbers recorded by cameras and will be billed by mail, at a higher toll rate.
, a share of $147 million in federal grant money provided by the Trump administration was being used to partially fund upgrades to I-95.

Future

, the entirety of I-95 is designated for widening from four lanes to either six or eight lanes and the reconfiguring of numerous interchanges. The project is being undertaken in several stages, with projects that, as of 2022, have been funded and are in various stages of completion, covering the route from milemarker 13 near Lumberton to milemarker 81 north of Fayetteville.
Begun in January 2020, a project is under way to expand I-95 from four to eight lanes between exits 55 and 71, north of Fayetteville. This includes the reconstruction of several bridges, overpasses, underpasses, and interchanges both on I-95 and on crossing roads. When complete, the freeway will be a total of eight lanes through this stretch., the project is scheduled to be completed in 2026. The project is partially funded by the Infrastructure for Rebuilding America.
Scheduled to begin in mid-2022 is another project to widen I-95 to eight lanes from the I-74 interchange to exit 22. It is also expected to be completed in the middle of 2026.
The next two phases of the widening project along I-95 includes sections Cumberland and Robeson counties between exit 22 and exit 40 and in Harnett and Johnston counties between exit 71 and exit 81., funding was expected for the Cumberland and Robeson section after 2027 and construction scheduled for the Harnett and Johnston counties section in 2026.

Related routes

There are two auxiliary routes and one business loop in the state. I-295 connects I-95 to US 401 in Fayetteville and serves as a full bypass for I-95 in the city. I-795 connects Goldsboro to Wilson. I-95 Bus. goes through central Fayetteville. I-95 used to have I-495 connecting to Raleigh which is now part of I-87.