Hongling South station


Hongling South station is an interchange station between Line 9 and Line 11 of the Shenzhen Metro. The Line 9 station opened on 28 October 2016. This station is located under the southeast of the intersection of Hongling South Road and Shennan East Road. The station is an indirect interchange with Line 1 and Line 2 at Grand Theater Station. The Line 11 station opened on 28 December 2025.

Station layout

Entrances/exits

The Line 9 station has 4 points of entry/exit, of which Exit A is connected to the underground crossing of the Grand Theater, and there is an underground passage next to Exit D to connect to Station. There is also Exit B which has not been built. There are currently only two entrances/exits of Line 11. Exits F and H of Line 11 are reserved, as surrounding these exits is currently a construction site. Exits D and G are accessible via elevators.