Hongling South station
Hongling South station is an interchange station between Line 9 and Line 11 of the Shenzhen Metro. The Line 9 station opened on 28 October 2016. This station is located under the southeast of the intersection of Hongling South Road and Shennan East Road. The station is an indirect interchange with Line 1 and Line 2 at Grand Theater Station. The Line 11 station opened on 28 December 2025.
Station layout
Entrances/exits
The Line 9 station has 4 points of entry/exit, of which Exit A is connected to the underground crossing of the Grand Theater, and there is an underground passage next to Exit D to connect to Station. There is also Exit B which has not been built. There are currently only two entrances/exits of Line 11. Exits F and H of Line 11 are reserved, as surrounding these exits is currently a construction site. Exits D and G are accessible via elevators.- A: Hongling South Road, Hongling Building, Shennan Middle Road, Wande Building, News Building, Deng Xiaoping's Portrait, Lizhi Park, Lixiangfang, Shenzhen Grand Theater, Hongling Middle Road
B:- C: Jinhua Street, Lijing Buildingd
- D: Shennan East Road, Financial Center, Jintang Street, Shenye Center, China Construction Bank Building, Shenzhen Bookstore, Bookstore Road, station
- E: Jinhua Street, Urban Construction Yunqi Building, Binyuan Community, Binhe Primary School
- G: Jintang Street, Lichang Building, Luohu Senior High School, Ping An Bank Building