HillTopper Wind Farm
The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity. The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018.