The Summit railway station is the southern, upper terminus of the Snowdon Mountain Railway, located within yards of the summit of Snowdon. In 2009 a new station building was opened, which was named Hafod Eryri.
The line starts in the valley bottom at Llanberis at an altitude of. Summit station stands at, below the summit of the mountain, to which it is connected by a short stepped path. There is a café at the top.
History
The first buildings on the summit predate the railway, and were erected at the Snowdon summit in 1838 to sell refreshments, and a licence to sell intoxicating liquor was granted in 1845. Very basic accommodation was also provided for visitors.The station opened with the railway on 6 April 1896, but both closed the same day following an accident. They reopened a year later, on 9 April 1897. After the station opened, the company strove to get an alcohol licence for its own proposed new hotel, but being unable to, took over both summit huts by 1898.
During the 1930s, many complaints were received about the state of the facilities at the summit and in 1934/5 a new station building was erected in two phases; the upstairs accommodation was completed in 1937. It was designed by Sir Clough Williams-Ellis and included rooms for visitors and a cafe. The other operators were bought out and the ramshackle collection of buildings on the summit was cleared. The flat roof was intended to be used as a viewing platform and some photographs show it being used in this way. However, other photographs taken of the cafe show that the roof leaked, which probably explains why the practice was stopped. The Summit was taken over by government agencies during the war and the accommodation was restricted to staff use afterwards. Having become increasingly dilapidated in post-war decades, this building was described by Prince Charles as "the highest slum in Wales". Its state led to a campaign to replace the building. In April 2006, Snowdonia National Park Authority with the support of the Snowdonia Society agreed a deal to start work on a new cafe and visitor centre complex. By mid-October 2006 the old building had been largely demolished.
The 1930s station operated until 2006 except during World War II. In September 2006 the station and associated buildings were demolished for complete rebuilding, passenger services terminating at Clogwyn until the new visitor centre of Hafod Eryri and station were opened by Welsh First Minister Rhodri Morgan on 12 June 2009.