HRCS2


The HRCS2 Hyundai Rotem is a dual-voltage electric multiple unit built by Hyundai Rotem.

History

The trains were ordered by Ukrainian Railways in preparation for the football championship UEFA Euro 2012 to transport passengers between cities that would host sporting events. The contract included delivery of 10 multiple units for $307 million, and an option for four diesel trains for an additional $43 million. The South Korean trains were delivered by ship to Odessa on March 11, 2012. Unit HRCS2-002 was taken into service at Odessa Zastava-1 and sent to Kharkiv on March 16 for acceptance testing, followed by Unit -001 on March 17. Units -003 and -004 arrived in the port of Odessa on April 9, 2012, and were delivered to Kharkiv in April 2012, followed by units -005 and -006 in May. All six units had passed their acceptance tests by June 1, 2012, the remaining four trains followed until August 2012.
The trains are referred to in Ukraine as Intercity and Intercity+. The trains had not undergone full-scale four-season tests, as is usually done in the railway sector.
In December 2012 the trains broke down on a daily basis, due to the cold weather. This led to criticism/regret by passengers and President of Ukraine Viktor Yanukovych that the train was bought. Hyundai Rotem offered its apologies to Ukrainian passengers, citing its "first winter in the country". The company will have its own team of engineers in Ukraine till 2018. Early October 2013 the company guaranteed "continuous operation" of the Intercity+ trains in the coming autumn and winter. However, all trains were taken out of service on February 12, 2014. Service resumed with one train set on April 29, 2014. The modernization program was scheduled to be completed at the end of July 2014, and new service was added on August 22, 2014 between Darnytsia, Kiev and, Ternopil. As of August 23, 2015, all HRCS2 trains have Wi-Fi access on board.

Description

The HRCS2 is an electric multiple unit train designed to carry passengers on electrified lines with nominal voltages of 25 kV AC 50 Hz and 3 kV DC, running on track of. In service, the trains reach speeds of 160 km/h.
Each trailer car uses two asymmetric collectors manufactured by LEKOV and has one main transformer; each transformer feeds traction power to the two adjacent cars.
Each motor car has four asynchronous traction motors with a rated power of 250 kW that are powered by 4QS converter and inverter.
The train uses an air suspension system.

Composition

The trainset is formed with two headcars, three trailers, and four motor cars under the scheme: Mc1+T+MB+M2+T+M1+M2+T+Mc2
The number of cars in the nine trains. Provides for operation of two articulated trains. The train has a two-class cars, "first class" and "second class", all places sedentary. First-class carriage – 2, 5, 8, and the second – 1, 3, 4, 6, 7, 9. In the first-class carriage, two armchairs arranged in two rows in the standard cars – two and three in the two series. The total number of seats in the train – 579. Locations are in the I class trailer cars, and Class II in six motor cars. Two seats for the disabled are the first head coach.

In-service use

Electric operated in Lviv, Southwestern, Southern, Donetsk, and Near-Dnipro railways.
Trains run daily in the following areas: