Guthrie Corridor Expressway
E35 Guthrie Corridor Expressway, GCE, is an expressway in Klang Valley, Selangor, Malaysia. It connects Shah Alam to Rawang. GCE is approximately long on the Prolintas sections and on the PLUS Expressway sections).
Named after the corridor of estates where 80 percent of the land acquired was from the plantation company Guthrie Berhad, all project costs, including land acquisition of the expressway, were completely borne by the concessionaire. Today this expressway is owned by Prolintas and its subsidiary Prolintas Expressway Sdn Bhd.
The starting point of the highway or 'Kilometre Zero' is located at the Jalan Monfort intersection near Shah Alam.
History
Plans to build the 30 km-long expressway, named after Kumpulan Guthrie's corridor of estates in Selangor, began in late 1996. The expressway would be a way to speed up and link various developments around the corridor, including the Lagong satellite city and the Bukit Jelutong township. The construction of the expressway would cost between RM 300 million and RM 450 million and would be completed in three to four years. Kumpulan Guthrie had submitted an application to the federal government and was still negotiating with the Selangor state government.The proposal was revived in 2002 when Guthrie Berhad became a major shareholder of this project, apart from owning other businesses such as large plantations and property development projects. Construction started in 2003 and was completed in April 2005. It commenced operations in July that year.
In August 2007, GCE became a subsidiary of Prolintas Expressway Sdn Bhd, which is ultimately owned by PNB.
On 17 August 2023, a private plane carrying Pahang State Legislative Assembly member Johari Harun and seven other passengers crashed onto the highway, just outside the Elmina interchange. There were ten fatalities, including the passengers and two motorists.
Features
- Smooth access from Shah Alam to northern states without being trapped in common traffic jams in the New Klang Valley Expressway.
- Many oil palm estates with property development potential along this expressway.
- Motorcycle lane, including a southbound flyover which passes above the Denai Alam exit, built as part of the DASH Highway construction project.
- SOS emergency.
- Competitive toll rate.
- Speed limits are 90 km/h–110 km/h
- Several rest areas near toll plazas with free Wi-Fi
- Malaysian Road Transport Department Enforcement Stations
Speed limits
The speed limits for majority sections of GCE are 90 km/h–110 km/h, including the speed limits as below- Rawang South Interchange–Elmina – 110 km/h
- Bukit Subang Interchange–Bukit Jelutong – 90 km/h
- Approaching toll plaza – 60 km/h
Tolls
GCE adopts an open toll system.Electronic Toll Collections (ETC)
As part of an initiative to facilitate faster transactions at the Bukit Jelutong, Elmina and Lagong Toll Plazas, all toll transactions at these three toll plazas on GCE are conducted electronically via Touch 'n Go cards or SmartTAGs beginning 2 March 2016.Toll rates
There are three toll plazas along GCE, each charging the same rate. In October 2022, it was one of the four expressways maintained by PROLINTAS to have its toll rates deducted between 8% and 15%.| Class | Type of vehicles | Rate |
| 0 | Motorcycles | Free |
| 1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | 1.75 |
| 2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | 3.80 |
| 3 | Vehicles with 3 or more axles | 5.70 |
| 4 | Taxis | 0.83 |
| 5 | Buses | 1.29 |