Guiyang Metro


The Guiyang Metro is a rapid transit system in the city of Guiyang, Guizhou province, China. It is operated and branded as Guiyang Urban Rail Transit.
A short northern section of Line 1 opened on 28 December 2017, with the full line entering operation on 1 December 2018. Line 2 opened on 28 April 2021. Line 3 opened on 16 December 2023. Line S1 opened on 28 December 2024. Line T2, a tram line, is also under construction.

Fares

Fares are determined based on the distance traveled, with a maximum fare of RMB 8, and a minimum fare of RMB 2. Children under 1.3 meters in height ride for free, while other children pay half-price. Individuals over 70 years old enjoy free travel on public transportation in Guiyang.
DistanceFareAnnotations
< 4kmRMB 2
4 - 12 km RMB 3 / 4RMB +1 for every 4 km traveled after the first 4 km
12 - 24 km RMB 5 / 6RMB +1 for every 6 km after traveling the first 12 km
> 24kmRMB 7 / 8RMB +1 for every 8 km after first 24 km traveled

Rolling Stock

Lines 1, 2, 3, S1 utilize 6 car Type-B trains manufactured by CRRC Nanjing Puzhen. Tram line Line T2 will utilize rubber-tyred trams manufactured by BYD Company

Lines in operation

Line 1

was approved for construction on 6 May 2013, and approved for plan in 2006. The line goes through Guanshanhu, Yunyan, Nanming and Huaxi Districts. The line twice crosses Nanming River and connects the downtown area with a number of outlying districts. The line depots are Xiaohe Depot and Guanshanhu Depot. The railway electrification system uses an overhead line. Line 1 runs northwest to south.

Line 2

Line 2 is 40.6 km with 32 stations, including 30 underground stations and 2 elevated stations. Line 2 runs north to southeast. It opened on April 28, 2021.

Line 3

The first phase of Line 3 is 43.03 km in length and has 29 stations. Line 3 runs from northeast to south. It opened on 16 December 2023.

Line S1

The first phase of Line S1 opened in 2024. It is 30.32 km in length, including a 22.64 km underground section and 7.68 km elevated section.

Lines under construction

Line T2

The first phase of tram line Line T2 is under construction. It will be 10.92 km in length, with 13 stations, using BYD SkyShuttle technology. It is expected to open in 2025.

Future development

Lines 4, S2, S3, S4, and Line G1 which passes through the Gui'an New Area, are in the planning stage.