Guangqumen Wai station is an interchange station between Line 7 and Line 17 of the Beijing Subway. The Line 7 station opened on December 28, 2014. The Line 17 station is expected to open in June 2026 in tandem with the Majuan Public Transport Hub.

Timetable

Station layout

The station has underground island platforms for both Line 7 and Line 17.

History

Line 7

The Line 7 station opened on December 28, 2014 as a part of the stretch between and and is located between to the west and to the east.

Line 17

The Line 17 station and the Majuan Public Transport Hub will be completed in June 2026. In the initial opening of the Line 17 middle section on December 27, 2025, trains will not stop at this station until the transport hub is complete.

Exits

Line 7

There are 3 exits, lettered A, B, and D. Exit B is accessible via a stairlift.

Line 17

There are 3 exits, lettered F1, F2, and G.