Guadalajara Mi Macro
The Guadalajara Mi Macro is a bus rapid transit system in Guadalajara, Jalisco, Mexico. The initiation of work on the system was announced by Jalisco Governor Emilio González Márquez on February 29, 2008. The system was launched on March 10, 2009 by him and Mexican President Felipe Calderón Hinojosa.
Lines
The first line runs along Calzada Independencia and Gobernador Curiel avenues with a total of 27 stations, including two terminals: Mirador and Fray Angélico. The line intersects the LRT's Line 2 at San Juan de Dios station. After the LRT Line 3 was completed in 2016, a second transfer point was created at the station immediately south, Bicentenario / Independencia.The first line has been renamed Mi Macro Calzada to distinguish it from the second BRT line running along the ring road, which opened in 2022. The second line is named Mi Macro Periférico and includes 42 stations over a route. The Periférico line, formerly nicknamed Peribús, was initially projected to serve 364,000 daily riders; it was first funded in January 2017 from Fondo Nacional de Infraestructura with a grant of 660.8 million pesos, subsidizing a larger contribution from the Jalisco state government. Work on the Periférico line began in November 2019, and was projected to complete in 2021.
Calzada
The stations on the Calzada line are:- Mirador
- Huentitán
- Zoológico
- Independencia Norte
- San Patricio
- Igualdad
- Monumental
- Monte Olivette
- Circunvalación
- Ciencias de la Salud
- Juan Álvarez
- Alameda
- San Juan de Dios
- Bicentenario
- La Paz
- Niños Héroes
- Agua Azul
- Ciprés
- Héroes de Nacozari
- Lázaro Cárdenas
- El Deán
- Zona Industrial
- López de Legazpi
- Clemente Orozco
- Artes Plasticas
- Escultura
- Fray Angélico
Periférico
The stations on the Periférico line are:- Barranca de Huentitán
- Zoológico Guadalajara
- Independencia Norte
- Lomas del Paraíso
- Rancho Nuevo
- La Experiencia
- El Batán
- Periférico Norte
- La Cantera
- Tabachines
- Constitución
- Centro Cultural Universitario
- San Isidro
- Periférico Belenes
- Tuzanía
- Santa Margarita
- Acueducto
- 5 de Mayo
- San Juan de Ocotán
- Vallarta
- Estadio Chivas
- Ciudad Judicial
- Ciudad Granja
- Parque Metropolitano
- Chapalita Inn
- El Colli
- Felipe Ruvalcaba
- Miramar
- Mariano Otero
- El Briseño
- Agrícola
- López Mateos
- ITESO
- Terminal Sur de Autobuses
- Periférico Sur
- San Sebastianito
- 8 de Julio
- Toluquilla
- Adolf Horn
- Artesanos
- Las Pintas
- Carretera a Chapala
Proposed expansion
Additional lines were planned and were scheduled to open in 2010, soon after the opening of Macrobús Line 1. These included:- Macrobús Line 2 would run along Avenida Ávila Camacho and Calzada Revolución from Doctor Ángel Leaño in Zapopan to the new central bus terminal in Tlaquepaque. This route was later used for LRT Line 3.
- Macrobús Line 3 would run along Calzada del Obrero and Calzada Jesús González Gallo from Juan Pablo and Periferico to Glorieta El Álamo in Tlaquepaque. This line will eventually be extended to the Guadalajara International Airport in Tlajomulco along Fed. 44.
- Lázaro Cárdenas: serving 129,000 daily passengers on a similar to the earlier proposed Line 3 along Fed. 15 and Fed. 23
- Lopez Mateos: 54,000 passengers,
- 8 de Julio: 88,000 passengers,, parallel to the southern half of LRT Line 1
- Vallarta: 38,000 passengers,, acting as a western extension to LRT Line 2
- Gallo y Michel: 24,000 passengers,
Fleet
The initial Macrobús fleet included 41 blue articulated Volvo 7300 BRT buses, which are built on the Volvo B12M chassis and compliant with the Euro IV emissions standard. Mexico City also uses Volvo 7300 BRT buses for the Metrobús BRT system, but the Mexico City Volvo 7300 BRT buses are bi-articulated buses, while the Guadalajara BRT system uses single-articulated buses. 27 of the 41 were refurbished by July 2021 to extend their life by five years.In 2014, Guadalajara added four red articulated DINA S.A. Brighter buses to the Macro Calzada fleet. The newer DINA buses are compliant with the stricter Euro V emissions standard, and are equipped with a Cummins ISM 10.8L six-cylinder engine and a six-speed Allison Transmission. Neither the Volvo nor DINA buses are equipped with air conditioning.
For the Periférico Line, Mi Macro will use 37 articulated buses built on the Mercedes-Benz O 500 MA 2836 chassis, bodied by Busscar. The O 500 MA 2836 is also compliant with the Euro V emissions standard and is equipped with a six-cylinder OM 457 diesel engine.
Impact and ridership
As of February 2008, there were 130 bus routes running along Calzada Independencia and Gobernador Curiel, serviced by more than 2,000 buses. The goal of the BRT is to replace all non-BRT buses along the route. Many routes will be eliminated altogether and others altered so as to cross the BRT route and serve as feeder buses.It is expected that upon the initial route's launch, the BRT system will achieve a daily ridership of over 174,000 passengers.