Gorakhpur–Siliguri Expressway
Gorakhpur–Siliguri Expressway is an under-construction long, four-lane access-controlled greenfield expressway that will connect the Gorakhpur in Uttar Pradesh with Siliguri in West Bengal in India. Designed for speeds of up to 120 kmph, the road will be running almost parallel to the India–Nepal border, reducing both travel time and distance, from 14-15 hours only 8-9 hours, and from to. This strategic project, which will connect Eastern India to Northeast India will also benefit Nepal, is part of Bharatmala Pariyojana, and passes through three states in India, Uttar Pradesh, Bihar and West Bengal. Planned future extensions include the Siliguri-Guwahati Expressway to Assam's capital Guwahati.
History
Conception
In 2021, the plan of the expressway was proposed by the Ministry of Road Transport and Highways.Construction
Using Detailed Project Report by L.N. Malviya Infra Projects Private Limited, built in Engineering, Procurement and Construction mode, the project has several contraction packages for tender award.Construction packages by states
Uttar Pradesh
| Packages | Chainages | Contractor | Status |
| Package-1 | Gorakhpur Ring Road to Uttar Pradesh-Bihar border | TBD | Bidding process and land acquisition underway |
Bihar
| Packages | Chainages | Contractor | Status |
| Package-1 | Junction with National Highway 27 (East-West Corridor) at Forbesganj, Araria district | TBD | Bidding process underway |
| Package-2 | Junction with National Highway 327 at Kishanganj district to Bihar-West Bengal border | TBD | Bidding process underway |
| Package-3 | TBA | TBD | Bidding process underway |
West Bengal
| Packages | Chainages | Contractor | Status |
| Package-1 | Junction with National Highway 27 (East-West Corridor) at Bagdogra, Darjeeling district | TBD | DRA |
Features
Cost
Gorakhpur-Siliguri Expressway project is estimated to cost Rs 38,645 crore as per 2025 estimates, with Bihar contributing Rs 27,552 crore.Rivers and bridges
The expressway will cross several major rivers and have bridges over those, including Gandak, Bagmati and Kosi.Route
Length by states
Length by states is as follows:- Uttar Pradesh:
- Bihar:
- West Bengal: Total:
Route by states
Uttar Pradesh
The expressway will start from the Gorakhpur Ring Road, or National Highway 27 (East–West Corridor) at Gorakhpur, Gorakhpur district, and will run mostly parallel with NH-27. It will connect the following districts along with their cities: It passes through 111 villages of Gorakhpur, Kushinagar and Deoria districts of Uttar Pradesh.Bihar
The expressway will pass through the following districts along with their cities: It passes through 111 villages of Gorakhpur, Kushinagar and Deoria districts of Uttar Pradesh.- Gopalganj district
- Bettiah, West Champaran district
- Motihari, East Champaran district
- Sheohar, Sheohar district
- Sitamarhi, Sitamarhi district
- Darbhanga district
- Madhubani, Madhubani district
- Supaul district
- Forbesganj, Araria district
- Araria district
- Kishanganj district
West Bengal
The expressway will terminate again at NH-27 at Siliguri, Darjeeling district, and will pass through the following district along with its city before terminating:Spurs
Spurs to the following district headquarters are included in the scope of the main project:Planned extensions
Planned future extensions include the following:- Siliguri-Guwahati Expressway to Assam's capital Guwahati.
Inter-connectivity
- Gorakhpur: Bareilly-Gorakhpur Expressway,