Gorakhpur–Siliguri Expressway


Gorakhpur–Siliguri Expressway is an under-construction long, four-lane access-controlled greenfield expressway that will connect the Gorakhpur in Uttar Pradesh with Siliguri in West Bengal in India. Designed for speeds of up to 120 kmph, the road will be running almost parallel to the India–Nepal border, reducing both travel time and distance, from 14-15 hours only 8-9 hours, and from to. This strategic project, which will connect Eastern India to Northeast India will also benefit Nepal, is part of Bharatmala Pariyojana, and passes through three states in India, Uttar Pradesh, Bihar and West Bengal. Planned future extensions include the Siliguri-Guwahati Expressway to Assam's capital Guwahati.

History

Conception

In 2021, the plan of the expressway was proposed by the Ministry of Road Transport and Highways.

Construction

Using Detailed Project Report by L.N. Malviya Infra Projects Private Limited, built in Engineering, Procurement and Construction mode, the project has several contraction packages for tender award.

Construction packages by states

Uttar Pradesh
PackagesChainagesContractorStatus
Package-1Gorakhpur Ring Road to Uttar Pradesh-Bihar border TBDBidding process and land acquisition underway
Bihar
PackagesChainagesContractorStatus
Package-1Junction with National Highway 27 (East-West Corridor) at Forbesganj, Araria district TBDBidding process underway
Package-2Junction with National Highway 327 at Kishanganj district to Bihar-West Bengal border TBDBidding process underway
Package-3TBATBDBidding process underway
West Bengal
PackagesChainagesContractorStatus
Package-1Junction with National Highway 27 (East-West Corridor) at Bagdogra, Darjeeling district TBDDRA

Features

Cost

Gorakhpur-Siliguri Expressway project is estimated to cost Rs 38,645 crore as per 2025 estimates, with Bihar contributing Rs 27,552 crore.

Rivers and bridges

The expressway will cross several major rivers and have bridges over those, including Gandak, Bagmati and Kosi.

Route

Length by states

Length by states is as follows:
  • Uttar Pradesh:
  • Bihar:
  • West Bengal: Total:

Route by states

Uttar Pradesh

The expressway will start from the Gorakhpur Ring Road, or National Highway 27 (East–West Corridor) at Gorakhpur, Gorakhpur district, and will run mostly parallel with NH-27. It will connect the following districts along with their cities: It passes through 111 villages of Gorakhpur, Kushinagar and Deoria districts of Uttar Pradesh.

Bihar

The expressway will pass through the following districts along with their cities: It passes through 111 villages of Gorakhpur, Kushinagar and Deoria districts of Uttar Pradesh.

West Bengal

The expressway will terminate again at NH-27 at Siliguri, Darjeeling district, and will pass through the following district along with its city before terminating:

Spurs

Spurs to the following district headquarters are included in the scope of the main project:

Planned extensions

Planned future extensions include the following:
  • Siliguri-Guwahati Expressway to Assam's capital Guwahati.

Inter-connectivity

  • Gorakhpur: Bareilly-Gorakhpur Expressway,
which in turn connects to the Bareilly–Ludhiana Economic Corridor Expressway (includes Ambala-Shamli Expressway.

Benefits

The expressway will benefit Eastern and Northeast India as well as Nepal by many ways, as follows:Connectivity: The expressway will not only create a direct route from Gorakhpur to Northeast India, but will also connect the northeast region, along with the eastern half of Nepal, directly with the rest of India, through other expressways. For example, the connection with the national capital directly from Guwahati and Kathmandu will be created with the help of Gorakhpur–Shamli Expressway, and with the financial capital with the help of Delhi–Mumbai Expressway. This network will ensure faster, safer and better commute between the northeast region as well as Nepal.Travel time and distance reduction: This expressway will reduce both travel time and distance between Gorakhpu and Siliguri, from 14-15 hours only 8-9 hours, and from to.Trade: The expressway will help to boost trade by faster transportation of cargo between Eastern and North Eastern India, as well as Nepal, while boosting he economy of 3 states of India it passes through - Uttar Pradesh, Bihar and West Bengal - and boost neighbouring Nepal's economy. In the future it will be extended to Guwahati, resulting in growth in exports and reduced dependency on imports to and from North East India.Tourism: As this expressway will create a direct link from mainland India to Northeast India, it will result in a boost in tourist arrivals to northeast, as it is well known for its geography and environment. The rise in tourist arrivals will mark the growth and development of all dotted tourist attractions and destinations, including larger ones, all over the northeast region. It will also help Nepal in this respect, as it will create greater and faster accessibility, due to its proximity near the India–Nepal border.Employment: Due to increase in industrial activities along the expressway's route, various agricultural and industrial initiatives will help the states' economies and growth, along with Nepal. The establishment of these numerous centres will result in multiple job possibilities for thousands of people living in both the states and the neighbouring country.Protection of the Environment: To protect the green cover, plants and trees will be planted in between and both sides along the entire route of the expressway.

Status updates

2022 Mar: Land acquisition began for the project.2023 Jan: The National Highways Authority of India invited tenders for the project.2025 Mar: Target completion date is 2028.