The Genting Sempah–Genting Highlands Highway begins at the downhill Genting Sempah near EXIT 803 on E8 Kuala Lumpur–Karak Expressway. Its terminus is at Genting Highlands summit.History
The Genting Sempah–Genting Highlands Highway used to be a private highway owned by Genting Highlands Resort. Construction of the access road to Genting Highlands began on 18 August 1965 and took four years to complete from Genting Sempah to Mount Ulu Kali's peak. The access road finally opened on 31 March 1969 in conjunction with the official laying of the foundation stone for the Genting Hotel by the then-Prime Minister Tunku Abdul Rahman Putra Al-Haj. In 2001, a new bypass Chin Swee Bypass was designed as a downhill route from the summit to the downhill Chin Swee Caves Temple was constructed and completed in 2005. The construction of the new bypass was regarded as one of the most astonishing engineering projects in Malaysia.In 2021 and 2022, Genting Sempah was closed due to landslides caused by heavy rains that were exacerbated by climate change.
Notable events
- 18 August 1965 - Construction of the access road to Genting Highlands began.
- 31 March 1969 - The access road to Genting Highlands was opened.
- 30 June 1995 - 20 people were killed in a landslide at the Genting Highlands slip road near the Kuala Lumpur–Karak Highway.
- 16 July 1996 - A bus, ferrying a group of factory workers and their families on a holiday excursion, plunged into a 120-metre-deep ravine at km 1 near the Genting Highlands Resort, killing 17 of them. Six were children.
- 5 June 2004 - A retired businessman was killed when the bus he was skidded overturned and crashed at km 16 near Sri Layang roundabout.
- 31 March 2005 - A bus negotiating the sharp corner at km 18 at Gohtong Jaya roundabout skidded, hit the divider and landed on its side while coming down Genting Highlands. Fifteen passengers were injured.
- 13 April 2006 - A landslide occurred at 11 p.m. at km 3.8. The landslide at the new Chin Swee Bypass to Genting Highlands two days ago caused soil and boulders to cover the road, making it inaccessible to traffic. No one was apparently hurt.
- 22 September 2009 - Genting Malaysia Berhad has announced that soil erosion occurred at km 3.3 of a downhill road at the Genting Highlands Resort at 3.20 am. No one was apparently hurt.
- 29 October 2010 - Seven people were killed and more than 20 injured when the bus they were travelling in crashed at the slip roads for the Kuala Lumpur–Karak Expressway near Genting Sempah.
- 21 October 2011 - A man suffered light injuries when a landslide hit the front of his car at km 13.9 near Genting Highlands
- 21 August 2013 - At least 37 people were killed and 16 others injured when the bus carrying 53 passengers crashed into ravine at Km 3.5 of the Genting Sempah–Genting Highlands Highway near Chin Swee Caves Temple, Genting Highlands, Pahang. It was one of the worst road disasters in Malaysian history.
- 18 November 2014 - A landslide, caused by heavy rain, forced the closure of km 4.2 heading towards Genting Highlands.