GSAT-6A
GSAT-6A was a communication satellite launched by the Indian Space Research Organisation. It featured a unfurlable S-band antenna similar to the one used on GSAT-6. Around 17 minutes after lift-off, the three stage GSLV Mk.II rocket flying on GSLV F08 mission successfully injected the satellite into a geosynchronous transfer orbit. Due to power failure during its orbit raising burns the communication was lost with GSAT-6A before it could reach its final circular geostationary orbit.
History
GSAT-6A was launched to complement GSAT-6 satellite which was launched in August 2015 by ISRO. The cost of building GSAT-6A was around ₹270 crore. GSAT-6A was to provide mobile communication services to the Indian Armed Forces.Launch
GSLV-F08 carrying GSAT-6A spacecraft was launched from Second Launch Pad of Satish Dhawan Space Centre on 29 March 2018, 11:26 UTC and after flight of 17 minutes 45 seconds, placed GSAT-6A into its planned geostationary transfer orbit with apogee, perigee and orbital inclination of 20.64°. GSAT-6A spacecraft deployed its solar array after separation from CUS and established contact with ground station.On GSLV-F08, a High Thrust Vikas engine was inducted on second stage of GSLV with 6% higher thrust than before. The improved engine increased the payload capability of the vehicle. The electrohydraulic actuation system on second stage was also replaced with simpler and robust electromechanical system. The Cryogenic Upper Stage of GSLV F08 performed a burn to depletion for the first time. Officials said any improvement done to the vehicle would be incorporated into GSLV's future missions.