Ersha Island station


Ersha Island station is a station on Line 12 of the Guangzhou Metro and the terminus of the East section of the line. It is located underground on the north side of Yanyu Road within Guangzhou Development Park on Ersha Island in Guangzhou's Yuexiu District. It opened on 29 June 2025.

Station layout

This station is a two-storey underground station. The ground level is the exit, and it is surrounded by Yanyu Road, Datong Road, Guangzhou Development Park, Guangdong Overseas Chinese Museum, and other nearby buildings. The first floor is the concourse, and the second floor is the platform for Line 12.
This station is a cultural themed station on Line 12, with the design theme of "Juntian Guangle", the ceiling of the station adopts white air ducts and circular acoustic reflectors, and the concourse adopts irregular shape walls, so as to reflect the unique spatial texture and acoustic effect of the station to reproduce a concert hall.

Concourse

There are automatic ticket machines and an AI customer service center at the concourse. In order to facilitate pedestrian access, the north side of the concourse is divided into the paid area, which is equipped with multiple sets of escalators, stairs and special elevators, which are connected to the two platforms of Line 12 respectively.

Platform

The station has an island platform, and a side platform located under the Guangzhou Development Park.
In addition, there is a double storage track running through the station to the east end of the station, with two maneuvering tracks to the east of the storage tracks connecting to the main line in the direction of, and two crossovers connecting the main line up and down respectively to the west.
As a temporary terminus for the East section of Line 12, only the island platform is open to passengers. At this time, the train will route to Platform 3 via the storage track to clear passengers before going to the main line in the direction of through the maneuvering track at the west end of the station to turn back after the station before going to Platform 1 to pick up passengers.

Entrances/exits

The station has 3 points of entry/exit, with Exits B and C being accessible via elevators.A: Yanyu Road, Guangzhou Zhixin High School Ersha Island CampusB: Xiaowu Street,, Guangzhou Symphony Orchestra C: Datong Road, Ersha Island Hospital

History

In response to the construction of the station, part of the Guangzhou Development Park was enclosed in May 2020 for the construction of the main station structure. Subsequently, Xiaowu Street was closed on 7 October of the same year to facilitate station construction.
On 6 April 2022, the roof slab was sealed. The station completed the "three rights" transfer in January 2025. The station opened on 29 June 2025.

Future expansion

In the future, Line 12 trains coming from Higher Education Mega Center South station will terminate at Xunfenggang station once the Central section of Line 12 opens.