Erligou station did not enter into operation along with Line 6Phase I on December 30, 2012. Both Line 6 and Line 16 platforms opened on March 18, 2023. The platform for Line 16 is above the Line 6 platform.
Location
The station is located at the intersection of the north-south Sanlihe Road with the east-west thoroughfare known as Chegongzhuang West Road to the west of Sanlihe Road and Chegongzhuang Street to the east.