Englewood Avenue station
Englewood Avenue station is a light rail station on the MBTA Green Line C branch located in the median of Beacon Street just west of Englewood Avenue in Brookline, Massachusetts. The station consists of two low side platforms which serve the C branch's two tracks. Englewood Avenue is not accessible; a reconstruction for accessibility is planned for 2026.
Reconstruction
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. Design work for Englewood Avenue and seven other C Branch stations was 15% complete by December 2022. Designs shown in February 2024 called for the inbound platform to be shifted to the east side of the intersection.In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Tappan Street. The MBTA awarded a $41.9 million design-build contract in April 2025. Design work for and Englewood Avenue station was complete by September 2025., construction is expected to take place from spring 2026 to fall 2026. Tappan Street and Englewood Avenue are planned to be the first to be completed.