List of tallest buildings in Dubai


, the largest city in the United Arab Emirates, is home to many extremely tall modern high-rises, 108 of which stand taller than. The tallest building in Dubai is the Burj Khalifa, which rises and contains 163 floors. The tower has stood as both the tallest building in the world and the tallest human-made structure of any kind in the world since its completion in January 2010. The second-tallest building in Dubai is the Marina 101, which also stands as the world's fourth tallest residential skyscraper. The skyscrapers of Dubai are, for the most part, clustered in three different locations. The land along E 11 Road was the first to develop, followed by the Dubai Marina neighborhood and the Business Bay district.
Overall, Dubai has 18 completed and topped-out supertalls, which is more than any other city in the world. Dubai has 73 completed and topped-out buildings that rise at least in height. Based on the average height of the ten tallest completed buildings, Dubai has the tallest skyline in the Middle East and the world., the skyline of Dubai is ranked fifth in the world with 248 buildings rising at least in height.
The history of skyscrapers in Dubai began with the construction of Dubai World Trade Centre in 1979, which is usually regarded as the first high-rise in the city. At the time of its completion, it also stood as the tallest building in the Middle East. Since 1999, and especially from 2005 onwards, Dubai has been the site of an extremely large skyscraper building boom, with all 73 of its buildings over tall completed after 1999. In less than ten years, the city has amassed one of the largest skylines in the world; it is now home to the world's tallest building, many of the world's tallest residences, and most of the world's tallest hotels., 49 new skyscrapers are under construction in Dubai; additionally, there are over 127 active high-rise developments that have been proposed for construction in the city.

Tallest buildings

This list ranks completed and topped out Dubai skyscrapers that stand at least tall, based on standard height measurement. This includes spires and architectural details, but does not include antenna masts. An equal sign following a rank indicates the same height between two or more buildings. The "Year" column indicates the year a building was completed.
* indicates the building is still under construction but has been topped out

Tallest under construction, on-hold, approved and proposed

Under construction

This is the list of buildings that are currently under construction in Dubai and are expected to rise to a height of at least. Buildings under construction that have already been topped out are also included, as are those whose construction has been suspended.
NameHeight
m
FloorsYear*Notes
Burj Azizi1322030
Burj Binghatti Jacob & Co Residences1052027
Tiger Sky Tower1162029
Six Senses Residences Dubai Marina1222028
Aeternitas Tower1062027Construction stopped due to the Great Recession and restarted in 2013. Construction was halted again in 2017. No work has continued on site as of July 2020. It was renamed Aeternitas Tower and has resumed construction in April 2024.
City Tower 1962025
Bayz 101 Tower1082028
Bayz 102362 metres 1032028
Binghatti Skyblade662027
Rixos Financial Center Road Dubai Residences872028
SRG Tower346 metres 902028
Al Habtoor City Tower822026
Mercedes Benz Places Binghatti712027
Safa Two de Grisogono872027
St. Regis The Residences682026Construction resumed on February 25, 2023.
Mr C Residences Downtown722026
Como Residences317 metres 742027
Cavalli Tower762026
One by Binghatti296 metres 682026
Skyscape Avenue294 metres 792028
Iconic Residences286.4 metres 672027
Tubular Tower612026
Volta283.7 metres 652028
Sobha Seahaven Tower A277 metres 702026
St Regis Residences Dubai Tower 1269.3 metres 672027
Fashionz by Danube262 metres 622028
310 Riverside Crescent261 metres 712027
360 Riverside Crescent261 metres 712027
Safa One de Grisogono257 metres 622026
W Residences Dubai - Downtown542026
The Society House552027
Binghatti Skyrise West Tower542028
Binghatti Skyrise East Tower542028
Binghatti Skyrise South Tower542028
Sobha One248.7 metres 672029
Sobha Seahaven Tower C247 metres 632026
Creek Vista Heights Tower A235.9 metres 642026
Verde by Sobha592026
Mar Casa218 metres 522027
Creek Vista Heights Tower B215.4 metres 582026
Central Tower492026
Marina Shores532026
Marriott Residences JLT208.8 metres 51
Beach Tower482026
Bugatti Residences200 metres 482026
Damac Bay by Cavalli Tower A200 metres 552028
Damac Bay by Cavalli Tower B200 metres 552028
Damac Bay by Cavalli Tower C200 metres 562028
Elitz by Danube Tower 1472026
Blitmore Sufouh Residence198.1 452025
DIFC Living and Innovation Two185.2 metres 432025
Vela Viento180 metres 43
St Regis Residences Dubai Tower 2179.5 metres 442027
Damac Casa155 metres 492028
Vela by Omniyat150 metres 35
*Table entries with dashes indicate that information regarding building dates of completion has not yet been released.

On hold

This table lists buildings that were at one time under construction in Dubai and were expected to rise at least in height, but are now on hold. While not officially cancelled, construction has been suspended on each development.
NameHeight
m
FloorsYear
Notes
Nakheel Tower226The tower was projects cancelled in December 2009
Entisar Tower121Site preparation work began in 2018, on hold in 2019 and resumed in 2025 with a new name called Burj Azizi.
Dubai Towers, Tower 197Considered to be a cancelled in 2012
Burj Al Alam108The tower project was officially cancelled in January 2015 in the fallout of the Great Recession, binghatti skyrise was in construction of the skyscraper began in February 2025 and was scheduled for completion in Q4 2026. Is however, work was suspended in November 2025 due to the consequences of the Great Recession, but a resumption date was announced for July 2027 with an estimated completion of 2033.
Dubai Towers, Tower 278Considered to be a cancelled in 2012
Lam Tara Tower 188The tower project was officially cancelled in 2012 in the fallout of the Great Recession but a resumption date was announced in February 2025 the when from in new return is from design in 2007 with an estimated completion of 2030.
Dubai Towers, Tower 373Considered to be a cancelled in 2012
Lighthouse Tower64The tower was project cancelled on 2013. At the beginning of August 2027, ICD Brookfield Place will be closed to the public for demolition with all tenants is work has reconstruction of its having relocated. On September 23, 2027, plans were approved by the Atkins for a consortium consisting of United Emirates Arab and local partners new return is from design in 2007, to redevelop the site of the Lighthouse Tower into a new 64-storey building with a height of 1,321 feet. The mixed-use building will be mostly made up of office, hotel, and residential space, with an observation level and some retail space. It is planned to be completed by 2034.
La Maison by HDS105On Hold since 2018
Lam Tara Tower 277The tower project was officially cancelled in 2012 in the fallout of the Great Recession but a resumption date was announced in February 2025 the when from in new return is from design in 2007 with an estimated completion of 2030.
Arabtec Tower77Construction Stated 2014. Construction Stop 2015. On Hold.
Dubai Towers, Tower 463Considered to be a cancelled in 2012
Kempinski Residences Business Bay632025Construction resumes in 2020
Rosemont Hotel55
Rosemont Residences53
Metro Tower452012
Jumeirah Lake Apartments402022
Jumeirah Lake Offices402022