Delhi–Alwar Regional Rapid Transit System


The Delhi–Alwar Regional Rapid Transit System is a 164 km planned semi-high speed rail corridor that will connect Delhi, Gurugram, Rewari, SNB and Alwar. It is one of the three Namo Bharat corridors planned under Phase 1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation. With a maximum speed of and average speed of, the distance between Delhi and Alwar is projected to be covered in 104 minutes.
The corridor has been planned for dual use, accommodating both Regional Rapid Transit System services for longer-distance travel with fewer stops and metro services for shorter suburban travel with more frequent stops. The project's cost estimated in 2017 was 37,000 crores.

History

As part of the Integrated Transportation Plan 2032, the National Capital Region Planning Board identified eight rail-based rapid transit corridors to improve the efficacy of transportation system in the NCR. These were:
  1. Delhi - Gurgaon - Rewari - Alwar
  2. Delhi - Ghaziabad - Meerut
  3. Delhi - Sonipat - Panipat
  4. Delhi - Faridabad - Ballabhgarh - Palwal
  5. Delhi - Bahadurgarh - Rohtak
  6. Delhi - Shahadra - Baraut
  7. Ghaziabad - Khurja
  8. Ghaziabad - Hapur
Of the aforesaid corridors, Delhi-Alwar, Delhi-Panipat and Delhi-Meerut are to be constructed in the first phase. The Urban Mass Transit Company was commissioned to conduct a feasibility study on 23 March 2010. The study thus submitted was approved by the Planning Board in 2012. The contract was then transferred to NCRTC on 18 January 2017 to carry the study forward.
On 15 June 2018, the first phase of the project, a long segment from Hazrat Nizamuddin to Shahjahanpur-Neemrana-Behror, slated to cost an estimated 25,000 crore, was approved by the Haryana government.

Construction

Construction of the Delhi-Alwar RRTS is likely to commence from April 2026, lasting until November 2031.

Stations

There will be total 22 stations in total; 16 will be built in the first phase and the rest in later phases.

Status updates

June 2018: The Detailed Project Report of the project is approved by the Government of Haryana.December 2018: The Phase-I construction project proposal for Delhi-Gurgaon-Shahjahanpur-Neemrana-Behror stretch is approved by NCRTC.February 2019: The Government of Haryana approved the project.June 2019: The Government of Rajasthan approved the project.November 2019 Nov: Bids for the construction of the Gurgaon section of the project were invited.May 2022: Pre-construction work begins on the project's corridor in Gurgaon.March 2023: Pre-construction work complete in Gurgaon.October 2024: The Ministry of Housing and Urban Affairs announced that the commissioning of the networks linking Delhi-Panipat and Delhi to Shahjahanpur-Neemrana-Behror and Alwar is expected to commence in 2025.November 2024: It was decided that the entire rapid rail route will be developed all at once in one phase.May 2025: Construction likely to start in August 2026.