Daegyeong Line
The Daegyeong Line is a commuter rail service of the Daegu Metropolitan Subway system which connects the cities of Gumi, Daegu, and Gyeongsan. Services are operated by Korail on the existing Gyeongbu Line.
History
The line opened for service on 14 December 2024. Construction of the line began in 2019 and cost.Future plans
Buksam Station opens in 2025, while there are additional plans to extend the line north from Gumi to Gimcheon.Rolling stock
Nine 2-car EMU trainsets.Operations
Services on the Daegyeong Line will be supplemented by existing Mugunghwa workings between Gumi and Gyeongsan. Trains arrive every 15 minutes during rush hour and every 20 minutes at all other times. The maximum speed on the line is. A trip from Gumi to Gyeongsan takes approximately 48 minutes.The Daegyeong Line utilises a signalling system known as KTCS-2 which was developed by Hyundai Rotem.
Stations
The line is in length.| Station Number | Station Name | Station Name | Station Name | Transfer | Distance | Total Distance |
| K110 | Gumi | 구미 | --- | 0.0 | ||
| K111 | Sagok | 사곡 | 4.5 | 4.5 | ||
| K112 | Buksam | 북삼 | 5.2 | 9.7 | ||
| K113 | Waegwan | 왜관 | 9.1 | 18.8 | ||
| K114 | Waegwan Gongdan | 왜관공단 | 4.3 | 23.1 | ||
| K115 | Seodaegu | 서대구 | 20.0 | 42.1 | ||
| K116 | Wondae | 원대 | 3.1 | 45.2 | ||
| K117 | Daegu | 대구 | 1.2 | 46.4 | ||
| K118 | Dongdaegu | 동대구 | 3.2 | 49.6 | ||
| K119 | Gyeongsan | 경산 | 20.1 | 61.8 |