The New Croton Dam is a masonry gravity dam forming the New Croton Reservoir, both parts of the New York City water supply system. It stretches across the Croton River near Croton-on-Hudson, New York, about north of New York City.
Construction began in 1892 and was completed in 1906. Designed by Alphonse Fteley, the masonry dam is broad at its base and high from base to crest. At the time of its completion, it was the tallest dam in the world. It impounds up to of water, a small fraction of the New York City water system's total storage capacity of.
History
Background
The original Croton Dam was built between 1837 and 1842 to improve New York City's water supply. By 1881, after extensive repairs to the dam, which was high, the Old Croton Reservoir was able to supply about a day to the city via the Old Croton Aqueduct. To meet escalating water needs, the Aqueduct Commission of the City of New York ordered construction of a new Croton system in 1885. Hydro engineer James B. Francis was brought in as a consultant for the construction.The proposed dam and reservoir were to cover of land occupied by public and private buildings, six cemeteries, and more than 400 farms. Condemnation disputes led to "protests, lawsuits, and confusion" before payment of claims and the awarding of construction contracts. The work force on the new dam included stonemasons and laborers who had worked on the original dam. John B. Goldsborough, superintendent of excavations and hiring for the project, also recruited stonemasons from southern Italy, who re-located to New York.
Construction
Construction on the New Croton Dam, also known as Cornell Dam, began in 1892 and was completed in 1906.Building the dam meant diverting the river from its normal path and pumping the riverbed dry. To accomplish this, workers dug a crescent-shaped canal long and wide in the hill on the north side of the river, secured the canal with a masonry retaining wall, and built temporary dams to control the water flow. The initial construction lasted eight years, and extensive modifications and repairs went on for another six. Working conditions were often difficult. A silent film, The Croton Dam Strike, released in 1900, depicted labor-management problems related to the dam's construction.
Designed by Alphonse Fteley, the masony gravity dam is broad at its base and high from base to crest. At the time of its completion, it was the tallest dam in the world. Its foundation extends below the bed of the river, and the dam contains of masonry. The engineers' tablet mounted on the headhouse nearest the spillway lists the spillway length as and the total length of the dam and spillway combined as. New Croton Dam impounds up to of water, a small fraction of the New York City water system's total storage capacity of.
Work began in 1892 at a site on the property of A.B. Cornell downstream of the original dam, which was submerged by the new reservoir. New Croton Reservoir was eventually able to supply a day via a new aqueduct that carried water to Jerome Park Reservoir in the north Bronx, New York City.