Corredor Sur metro station


Corredor Sur is a station on Line 2 of the Panama Metro. It opened on 25 April 2019 as part of the inaugural section of the line between San Miguelito and Nuevo Tocumen. The elevated station is built above Avenida Domingo Díaz, near its junction with the Pan-American Highway, locally known as Corredor Sur. It lies between Don Bosco and Las Mañanitas.
On 16 March 2023, a branch of Line 2 known as El Ramal opened between Corredor Sur and Tocumen International Airport at Aeropuerto. Trains on this branch originate at Corredor Sur, with no through services from the main line. The first stop on the branch is ITSE.
At Corredor Sur, trains to the airport use the center track, while services toward San Miguelito and Nuevo Tocumen use the outer tracks. This arrangement enables cross-platform transfers between both directions of the main line and the airport branch.