The current alignment of SH 265 was originally a part of US 85 before it was rerouted onto Vasquez Boulevard in 1942, with SH 265 being designated over it. The section south of York Street was part of the original routing of SH 224 until 1954, when it was rerouted and SH 265 was extended south onto this segment where it exists today.