Chollet Hydroelectric Power Station
Chollet Hydroelectric Power Station is a hydroelectric power station under development across the Ngoko River, in Cameroon and the Republic of the Congo in Central Africa. The construction contract was awarded to China Gezhouba Group Company, in May 2021.
Location
The power station is located in southeastern Cameroon at the border with the Republic of the Congo, across the Dja River. The power station is also located close to the borders of the Central African Republic and Gabon.Overview
On 28 October 2010, Cameroon and Congo signed a memorandum of understanding to construct a 600 megawatts hydroelectric plant across the Ngoko River that runs along their common border. At that time, it was expected that each government would raise fifty percent of the construction funds. Sinohydro, the engineering and construction conglomerate was tasked to oversee the engineering, procurement, and construction.When the concept was re-visited in October 2020, Sinohydro was dropped as the EPC contractor, because the two countries could not independently raise the money to pay for the dam, under prevailing conditions. A new model of Build, Own, Operate and Transfer, was adopted. The Gezhouba Group was selected to undertake the task, under the new model.