Char Dham Railway


The Char Dham Railway, the Indian Railways's under-construction 453 km long railway lines network for connecting the holiest places of Hinduism called Chota Char Dham, includes two set of y-fork shaped rail links, first the A1 "Rishikesh–Karnaprayag-Karnaprayag–Saikot–Sonprayag Kedarnath Railway" from the existing Yog Nagari Rishikesh railway station to Kedarnath with a A2 "Saikot–Joshimath Badrinath Railway" fork, and second B1 Doiwala–Dehradun–Uttarkashi–Maneri Gangotri Railway from the Dehradun's existing Doiwala railway station to Gangotri with a B2 Uttarkashi–Palar Yamunotri Railway fork. The line is also of strategic military importance and has been designated a national project.

Details

Char Dham Railway project, with 327 km long lines will cost 74,000 crore.

Strategic importance

Once this railway line is completed, India-China border will be closer to the rest of India by railways. The time taken to reach the strategic border military stations from Delhi will be reduced by providing safe and quick mode of public transport for personnel and equipment.

Challenges

After the Konkan Railway, Hassan–Mangalore line and Jammu–Baramulla line, this line will be the most challenging railway project in Indian Railways due to mountainous terrain, a large number of tunnels and high bridges and severe cold weather in flood, landslide and earthquake prone high altitude mountainous area.

Route

The Char Dham Railway has two different Y-shaped railways, with total of the following four individual rail lines:

A. Rishikesh-Kedarnath–Badrinath railway

Rishikesh-Karanprayag-Saikot-Kedarnath main spur will go to Kedarnath which will also Y–fork at Saikot for another spur to Badrinath.

B. Doiwala-Gangotri–Yamunotri railway

"Doiwala-Uttarkashi–Maneri Gangotri" main spur will go to Gangotri which will also Y–fork at Uttarkashi for "Uttarkashi–Palar rail" link spur to Yamunotri.

Related connectivity

While Char Dham Rail will connect the area in Gharwal region, the DPR for the following new rail lines were announced in the 2024-25 to connect the other regions of Uttrakhand:
  • Kumaon region
  • * Tanakpur-Bageshwar-Gairsain-Karanprayag line: has the following two components.
  • ** Tanakpur-Bageshwar line: from Tanakpur in southeast to Bageshwar in northwest.
  • ** Bageshwar-Gairsain-Karanprayag line: from Bageshwar in east to Gairsain in west.
  • * Tanakpur-Pithoragarh-Jauljibi line: One of the strategic line required by the Army.
  • Terai region:
  • * Haridwar-Saharanpur line: from Haridwar in northeast to Saharanpur in southwest.

Current status