Chaku Khola Hydropower Station
Chaku Khola Hydropower Station is a run-of-the-river hydroelectric power station with an installed capacity of 3 MW. The power station is located in Sindhupalchok District, Nepal. The plant is operated by Alliance Power Nepal, an IPP.
Accidents
- 2015 October: The project was severely damaged due to aftershock of the Gorkha Earthquake.
- 2019 July: Two staffs were killed due to flood in the river.