CGR 3rd Class 4-4-0 1889


The Cape Government Railways 3rd Class 4-4-0 of 1889 was a South African steam locomotive from the pre-Union era in the Cape of Good Hope.
In 1889, the Cape Government Railways placed 24 3rd Class tender locomotives with a American type wheel arrangement in service. They were intended for passenger service on the Cape Western System.

Beyond Kimberley

In addition to increasing traffic on the Western System during 1887, the planned extension of the mainline northwards from Kimberley to Vryburg would also require an increase in the locomotive fleet. Michael Stephens, who had succeeded Hawthorne Thornton in 1885 as the Locomotive Superintendent of the Western System of the Cape Government Railways, therefore drew up detailed designs for a new 3rd Class passenger locomotive for the Western System. The drawings were prepared in the Salt River drawing office in Cape Town.

Manufacturer

An order for 24 of these locomotives was placed with Dübs and Company in Glasgow. The locomotives were built in two batches of twelve and were delivered early in 1889, numbered in the range from 93 to 116.
With a boiler pressure of, these were the first South African engines to use Ramsbottom safety valves instead of the older Salter spring balance valves. The overall design resulted in an attractive locomotive which reflected credit on the designer and the drawing office.

Service

Cape Government Railways

The locomotives were, at the time, modern and up to date with latest practices and were possibly the most efficient engines in the country. As was usual practice with passenger locomotives on the CGR, they were painted green and had polished brass domes. They were placed in service on the easier sections of the Western System and were used on all types of traffic. On the section between Beaufort West and Kimberley, they worked passenger trains successfully in spite of the poor quality coal from the colliery at Viljoensdrif, thanks to their more liberally-proportioned boilers.
During the Second Boer War from 1899 to 1902, at least one of these locomotives, no. 108, had armour plating fitted to protect the engine and crew from Boer small-arms fire. Two of the photographs show no. 108 in armour plating.
By 1904, six of the locomotives were transferred to the Midland System and renumbered in the range from 405 to 410. Here they were employed on the line between Port Elizabeth and Uitenhage.

South African Railways

When the Union of South Africa was established on 31 May 1910, the three Colonial government railways were united under a single administration to control and administer the railways, ports and harbours of the Union. Although the South African Railways and Harbours came into existence in 1910, the actual classification and renumbering of all the rolling stock of the three constituent railways was only implemented with effect from 1 January 1912.
All 24 locomotives survived to be taken onto the SAR roster in 1912. Since they were considered obsolete by then, they were designated Class 03 and renumbered by having the numeral "0" prefixed to their existing numbers. In SAR service, they continued to work on the Uitenhage line on the Midland System and on shunting and light duties on the Western System. Some of them survived until 1923.

Works numbers

The works numbers, original numbers and renumbering of the Cape 3rd Class of 1889 are listed in the table.

Works no.
Orig.
no.
1904
no.
SAR
no.
24869393093
24879494094
24889595095
2489964090409
24909797097
2491984060406
24929999099
24931001000100
24941014070407
24951021020102
24961031030103
24971044080408
25361051050105
25371061060106
25381071070107
25391081080108
25401091090109
25411104100410
25421114050405
25431121120112
25441131130113
25451141140114
25461151150115
25471161160116

Illustration

The main picture shows no. 114 near Bulawayo in Southern Rhodesia, c. 1900, working on the line from the Cape of Good Hope through the Bechuanaland Protectorate.