The power plant was established from the construction of concretegravity dam at an altitude of 545 meters along the HopingRiver basin in Hualien County. The dam at created a reservoir with a capacity of 635,000 m3. An intake valve was built connecting the dam with a 6,549 meter long headrace tunnel to Bihai Power Plant located at the downstream side at an altitude of 100 meters where a vertical Pelton turbine of 61.2 MW is installed.