Bekasi Line
The Jabodebek LRT Bekasi Line is one of the two light rapid lines of the Jabodebek LRT which serves trips from station to station. The distance traveled in this fully-elevated line is 29.54 km.
The Pancoran–Jatimulya section of the line runs along the Jakarta Inner Ring Road, Jakarta–Cikampek Toll Road, and the Jakarta–Cikampek Elevated Toll Road.
History
Like other public transportation systems in Jabodetabek area, the Jabodebek LRT system was built to break down congestion. The construction of the Cawang–Bekasi LRT Line and other lines in the first phase of the Jabodebek LRT construction began with the groundbreaking on 9 September 2015 by President Joko Widodo.Initially the phase 1 was targeted to be completed before the 2018 Asian Games. However, until the Asian Games were held, the overall progress was still 45%, thus it was unable to be commercially run as targeted.
On October 11, 2019, the first train of Jabodebek LRT arrived in Jakarta. The shipment was carried out by land directly from INKA factory in Madiun, East Java. For the time being, the train has been parked near Harjamukti station of the Cibubur Line; considering that the LRT depot construction in Jatimulya, which is this line's terminus, has not yet been completed.
In October 2020, the Jabodebek LRT trains began their trials.