So far, there have been a total of four lines confirmed:Line 1 from Jiangtan Road toGeelyIndustrial ParkLine 2passing through Guangyuan Road to Longteng Road and possibly further;Line 3 from Baoji South to Guozhenrailway stations with an extension planned from Qunli Road to Liancun, Fengxiang County. Line 4 will pass through Qingjiang Road to Dahancun Road and possibly further.